Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23356
Well Classification: GW Status: PR - 12/1/2018
Well Name/No:Puckett #35A-23-697
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2018
FacilityID:448167LocationID:416157
County:GARFIELD #045Location:NWNE 26 6S97W 6
Field:GRAND VALLEY - #31290Elevation:8396 ft.
Basin:PICEANCE BASIN  
Planned Location:871FNL  1402 FELLat/Long: 39.498850 / -108.183022Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498850 / -108.183022Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/9/2017
End Date: 8/12/2017
Reported: 12/7/2017
Days to report: 117
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2018             Measured TD: 9185 ft.    Vertical TD: 9017 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/22/2018
Proposed Top PZ Location:Sec:23 Twp: 6S 97W Footage: 341 FSL  1027 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97W Footage: 341 FSL  1027 FEL
Proposed Depth/Form:9162 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 40# , Citings Type: PLANNED
Cement:Sacks: 829, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9162 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 867, Top: 5227 ft., Bottom: 9162 ft.

Wellbore Completed
Completion Date:3/31/2017
Spud Date:3/26/2017Spud Date Is:ACTUAL
Measured TD:9185 ft.Measured PB depth:9114 ft.
True Vertical TD:9017 ft.True Vertical PB depth:8946 ft.
Top PZ Location:Sec:23 Twp: 6S 97WFootage: 319 FSL  858 FEL
Bottom Hole Location:Sec:23 Twp: 6S 97WFootage: 314 FSL  1055 FEL
Log Types:CBL, PNL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 54 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2520 ft., Weight: 40 , Citings Type: ACTUAL
Cement:Sacks: 904, Top: 0 ft., Bottom: 2520 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9162 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 941, Top: 3183 ft., Bottom: 9162 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH4591 ft.4895 ft.NN
FORT UNION4895 ft.6233 ft.NN
OHIO CREEK6223 ft.6443 ft.NN
WILLIAMS FORK6443 ft.8593 ft.NN
CAMEO8593 ft.9043 ft.NN
ROLLINS9043 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/29/2017                 Interval Top: 7188 ft.    Interval Bottom: 8937 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/29/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/9/2017Treatment End Date:8/12/2017
Treatment Summary:Frac'd with 56,227 bbls slickwater and 130 bbls 7.5% HCl acid.
Total fluid used in treatment (bbls):56357Max pressure during treatment (psi):7785
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):130Min frac gradient (psi/ft):0.49
Recycled water used in treatment (bbls):56227Total flowback volume recovered (bbls):26402
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8598 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/29/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1300
BTU_GAS 1057
CALC_BBLS_H2O 1300
CALC_MCF_GAS 1052
CASING_PRESS 755
MCF_GAS 1052
Perforation Data:
Interval Top:7188 ft.# Of Holes:189
Interval Bottom:8937 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)75
Total Gas Produced (MCF)30146
GOR401946
GOR DeterminationMCFE
Average BOE per Day14.456
Average MCFE per Day83.823

 Federal Financial Assurance  i 

 Tribal Well  i No