Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23245
Well Classification: GW Status: PR - 1/1/2026
Well Name/No:Chevron #11A-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2026
FacilityID:446098LocationID:335781
County:GARFIELD #045Location:Lot 1 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5585 ft.
Basin:PICEANCE BASIN  
Planned Location:1234FNL  2028 FELLat/Long: 39.528322 / -108.129592Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.528322 / -108.129592Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2026             Measured TD: 7757 ft.    Vertical TD: 7072 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/9/2018
Proposed Top PZ Location:Sec:17 Twp: 6S 96W Footage: 198 FNL  916 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96W Footage: 198 FNL  916 FWL
Proposed Depth/Form:7835 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 950 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 275, Top: 0 ft., Bottom: 950 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7781 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 879, Top: 3127 ft., Bottom: 7781 ft.

Wellbore Completed
Completion Date:7/1/2017
Spud Date:6/26/2017Spud Date Is:ACTUAL
Measured TD:7757 ft.Measured PB depth:7682 ft.
True Vertical TD:7072 ft.True Vertical PB depth:6996 ft.
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 193 FNL  977 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 204 FNL  877 FWL
Log Types:CBL, PNL, (TRIPLE-COMBO ON 045-23237).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1004 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 226, Top: 0 ft., Bottom: 1004 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7729 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 712, Top: 3680 ft., Bottom: 7729 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
ALLUVIUM0 ft.NN
WASATCH852 ft.NN
WASATCH G2772 ft.NN
FORT UNION3128 ft.NN
OHIO CREEK4502 ft.NN
WILLIAMS FORK4780 ft.NN
CAMEO7097 ft.NN
ROLLINS7645 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2026                  Interval Top: 5508 ft.    Interval Bottom: 7545 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/6/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/1/2017Treatment End Date:9/6/2017
Treatment Summary:Frac'd with 64,031 bbls slickwater.
Total fluid used in treatment (bbls):64031Max pressure during treatment (psi):7200
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):7684Total flowback volume recovered (bbls):33155
Fresh water used in treatment (bbls):56347Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7250 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/6/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2215
BTU_GAS 1072
CALC_BBLS_H2O 2215
CALC_MCF_GAS 359
CASING_PRESS 990
MCF_GAS 359
Perforation Data:
Interval Top:5508 ft.# Of Holes:216
Interval Bottom:7545 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)94
Total Gas Produced (MCF)46382
GOR493425
GOR DeterminationMCFE
Average BOE per Day22.196
Average MCFE per Day128.733

 Federal Financial Assurance  i Y

 Tribal Well  i No