Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23243
Well Classification: GW Status: SI - 1/1/2026
Well Name/No:Chevron #12A-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date1/1/2026
FacilityID:446096LocationID:335781
County:GARFIELD #045Location:Lot 1 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5586 ft.
Basin:PICEANCE BASIN  
Planned Location:1275FNL  2036 FELLat/Long: 39.528208 / -108.129656Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.528208 / -108.129656Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 1/1/2026             Measured TD: 7787 ft.    Vertical TD: 7059 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 1/1/2026
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/9/2018
Proposed Top PZ Location:Sec:17 Twp: 6S 96W Footage: 1417 FNL  807 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96W Footage: 1417 FNL  807 FWL
Proposed Depth/Form:7790 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 950 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 275, Top: 0 ft., Bottom: 950 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7790 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 890, Top: 3082 ft., Bottom: 7790 ft.

Wellbore Completed
Completion Date:6/3/2017
Spud Date:5/28/2017Spud Date Is:ACTUAL
Measured TD:7787 ft.Measured PB depth:7718 ft.
True Vertical TD:7059 ft.True Vertical PB depth:6990 ft.
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 1495 FNL  849 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 1527 FNL  794 FWL
Log Types:CBL, PNL, (TRIPLE-COMBO ON 045-23237).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1214 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 274, Top: 0 ft., Bottom: 1214 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7766 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 712, Top: 4163 ft., Bottom: 7766 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
ALLUVIUM0 ft.NN
WASATCH851 ft.NN
WASATCH G2771 ft.NN
FORT UNION3145 ft.NN
OHIO CREEK4501 ft.NN
WILLIAMS FORK4802 ft.NN
CAMEO7144 ft.NN
ROLLINS7628 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 1/1/2026                  Interval Top: 5524 ft.    Interval Bottom: 7548 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/13/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/6/2017Treatment End Date:9/12/2017
Treatment Summary:Frac'd with 64,000 bbls slickwater and 12 bbls 7.5% HCl acid.
Total fluid used in treatment (bbls):64000Max pressure during treatment (psi):7386
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):4708Total flowback volume recovered (bbls):32866
Fresh water used in treatment (bbls):59280Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7250 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/13/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2697
BTU_GAS 1070
CALC_BBLS_H2O 2697
CALC_MCF_GAS 373
CASING_PRESS 900
MCF_GAS 373
Perforation Data:
Interval Top:5524 ft.# Of Holes:219
Interval Bottom:7548 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)71
Total Gas Produced (MCF)56840
GOR800563
GOR DeterminationMCFE
Average BOE per Day27.096
Average MCFE per Day157.172

 Federal Financial Assurance  i 

 Tribal Well  i No