Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23240
Well Classification: GW Status: SI - 10/1/2025
Well Name/No:Chevron #21E-17
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:SIStatus Date10/1/2025
FacilityID:446093LocationID:335781
County:GARFIELD #045Location:Lot 1 17 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5586 ft.
Basin:PICEANCE BASIN  
Planned Location:1289FNL  2038 FELLat/Long: 39.528169 / -108.129675Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.528169 / -108.129675Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: SI - 10/1/2025             Measured TD: 7539 ft.    Vertical TD: 7051 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        SI - 10/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/9/2018
Proposed Top PZ Location:Sec:17 Twp: 6S 96W Footage: 2584 FSL  1837 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96W Footage: 2584 FSL  1837 FWL
Proposed Depth/Form:7166 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 950 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 275, Top: 0 ft., Bottom: 950 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7539 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 823, Top: 3154 ft., Bottom: 7539 ft.

Wellbore Completed
Completion Date:5/22/2017
Spud Date:5/17/2017Spud Date Is:ACTUAL
Measured TD:7539 ft.Measured PB depth:7460 ft.
True Vertical TD:7051 ft.True Vertical PB depth:6971 ft.
Top PZ Location:Sec:17 Twp: 6S 96WFootage: 2624 FSL  1883 FWL
Bottom Hole Location:Sec:17 Twp: 6S 96WFootage: 2584 FSL  1820 FWL
Log Types:CBL, PNL, (TRIPLE-COMBO ON 045-23237).
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL
Cement:Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1001 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 245, Top: 0 ft., Bottom: 1001 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7506 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2070 ft., Bottom: 7506 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
ALLUVIUM0 ft.NN
WASATCH609 ft.NN
WASATCH G2529 ft.NN
FORT UNION3009 ft.NN
OHIO CREEK4248 ft.NN
WILLIAMS FORK4540 ft.NN
CAMEO6877 ft.NN
ROLLINS7364 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  SI - 10/1/2025                 Interval Top: 5299 ft.    Interval Bottom: 7293 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/3/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/24/2017Treatment End Date:8/31/2017
Treatment Summary:Frac'd with 64,002 bbls slickwater.
Total fluid used in treatment (bbls):64002Max pressure during treatment (psi):7440
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):6400Total flowback volume recovered (bbls):26623
Fresh water used in treatment (bbls):57602Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7037 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/3/2017Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1868
BTU_GAS 1085
CALC_BBLS_H2O 1868
CALC_MCF_GAS 928
CASING_PRESS 810
MCF_GAS 928
Perforation Data:
Interval Top:5299 ft.# Of Holes:219
Interval Bottom:7293 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)31
Total Gas Produced (MCF)11137
GOR359258
GOR DeterminationMCFE
Average BOE per Day5.391
Average MCFE per Day31.270

 Federal Financial Assurance  i 

 Tribal Well  i No