|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/19/2017 Measured TD: 7693 ft. Vertical TD: 7091 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/19/2017 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/9/2018 | | Proposed Top PZ Location: | Sec:17 Twp: 6S 96W | Footage: 917 FNL 806 FWL | | Bottom Hole Location: | Sec:17 Twp: 6S 96W | Footage: 917 FNL 806 FWL | | Proposed Depth/Form: | 7761 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-11 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8# , Citings Type: PLANNED | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 950 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 275, Top: 0 ft., Bottom: 950 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7761 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 880, Top: 3100 ft., Bottom: 7761 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/13/2017 | | Spud Date: | 6/9/2017 | Spud Date Is: | ACTUAL | | Measured TD: | 7693 ft. | Measured PB depth: | 7626 ft. | | True Vertical TD: | 7091 ft. | True Vertical PB depth: | 7025 ft. | | Top PZ Location: | Sec:17 Twp: 6S 96W | Footage: 868 FNL 1015 FWL | | Bottom Hole Location: | Sec:17 Twp: 6S 96W | Footage: 926 FNL 868 FWL | | Log Types: | CBL, PNL, (TRIPLE-COMBO ON 045-23237). | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 100 ft., Weight: 52.8 , Citings Type: ACTUAL | | Cement: | Sacks: 218, Top: 0 ft., Bottom: 100 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 1004 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 242, Top: 0 ft., Bottom: 1004 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7642 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 712, Top: 3157 ft., Bottom: 7642 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | ALLUVIUM | 0 ft. | | N | N | | WASATCH | 791 ft. | | N | N | | WASATCH G | 2711 ft. | | N | N | | FORT UNION | 3058 ft. | | N | N | | OHIO CREEK | 4441 ft. | | N | N | | WILLIAMS FORK | 4696 ft. | | N | N | | CAMEO | 7032 ft. | | N | N | | ROLLINS | 7536 ft. | | N | N |
Formation WFCM Formation Classification: GW Status: PR - 9/19/2017 Interval Top: 5420 ft. Interval Bottom: 7452 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/19/2017 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/13/2017 | Treatment End Date: | 9/18/2017 | | Treatment Summary: | Frac'd with 64,000 bbls slickwater. | | Total fluid used in treatment (bbls): | 64000 | Max pressure during treatment (psi): | 7228 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.40 | | Type Of gas: | | Number Of staged intervals: | 8 | | Total acid used in treatment (bbls): | 0 | Min frac gradient (psi/ft): | 0.69 | | Recycled water used in treatment (bbls): | 14720 | Total flowback volume recovered (bbls): | 27023 | | Fresh water used in treatment (bbls): | 49280 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7135 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/19/2017 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3665 | | BTU_GAS | 1067 | | CALC_BBLS_H2O | 3665 | | CALC_MCF_GAS | 365 | | CASING_PRESS | 875 | | MCF_GAS | 362 |
| | Perforation Data: | | Interval Top: | 5420 ft. | # Of Holes: | 222 | | Interval Bottom: | 7452 ft. | Hole Size: | 0.37 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 71 |
| Total Gas Produced (MCF) | 46153 |
| GOR | 650042 |
| GOR Determination | MCFE |
| Average BOE per Day | 22.019 |
| Average MCFE per Day | 127.720 |
| Federal Financial Assurance | i | Y |
|
|