|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 11/22/2016 Measured TD: 9798 ft. Vertical TD: 9475 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 11/22/2016 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 6/9/2018 | | Proposed Top PZ Location: | Sec:7 Twp: 7S 93W | Footage: 268 FNL 902 FWL | | Bottom Hole Location: | Sec:7 Twp: 7S 93W | Footage: 268 FNL 902 FWL | | Proposed Depth/Form: | 9759 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED | | Cement: | Sacks: 30, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED | | Cement: | Sacks: 296, Top: 0 ft., Bottom: 1124 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9759 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 794, Top: , Bottom: 9759 ft. |
| | |
| Wellbore Completed | | Completion Date: | 10/16/2016 | | Spud Date: | 10/10/2016 | Spud Date Is: | ACTUAL | | Measured TD: | 9798 ft. | Measured PB depth: | 9746 ft. | | True Vertical TD: | 9475 ft. | True Vertical PB depth: | 9423 ft. | | Top PZ Location: | Sec:7 Twp: 7S 93W | Footage: 258 FNL 916 FWL | | Bottom Hole Location: | Sec:7 Twp: 7S 93W | Footage: 242 FNL 861 FWL | | Log Types: | CBL/MUD/RPM/Triple Combo in 045-23232 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 84 ft., Weight: 47.4 , Citings Type: ACTUAL | | Cement: | Sacks: 31, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1144 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 310, Top: 0 ft., Bottom: 1144 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9788 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1120, Top: 3584 ft., Bottom: 9788 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 3514 ft. | | | | | MESAVERDE | 5882 ft. | | | | | OHIO CREEK | 5882 ft. | | | | | WILLIAMS FORK | 6052 ft. | | | | | CAMEO | 8795 ft. | | | | | ROLLINS | 9640 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 11/22/2016 Interval Top: 7562 ft. Interval Bottom: 9560 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 11/10/2016 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 11/7/2016 | Treatment End Date: | 11/10/2016 | | Treatment Summary: | 48507 BBLS Slickwater; 944050 100/mesh; (summary)
| | Total fluid used in treatment (bbls): | 48507 | Max pressure during treatment (psi): | 5970 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 10 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.75 | | Recycled water used in treatment (bbls): | 48507 | Total flowback volume recovered (bbls): | 40741 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | | | Total proppant used (lbs): | 944050 | Green completions techniques utilized: | -- | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 9359 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 11/22/2016 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1049 | | CALC_MCF_GAS | 1048 | | CASING_PRESS | 1950 | | MCF_GAS | 1048 | | TUBING_PRESS | 1020 |
| | Perforation Data: | | Interval Top: | 7562 ft. | # Of Holes: | 240 | | Interval Bottom: | 9560 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 110 |
| Total Gas Produced (MCF) | 50184 |
| GOR | 456218 |
| GOR Determination | MCFE |
| Average BOE per Day | 24.004 |
| Average MCFE per Day | 139.244 |
| Federal Financial Assurance | i | |
|
|