Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23234
Well Classification: GW Status: PR - 11/21/2016
Well Name/No:Youberg #RU 411-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/21/2016
FacilityID:446087LocationID:323942
County:GARFIELD #045Location:SENW 7 7S93W 6
Field:RULISON - #75400Elevation:7338 ft.
Basin:PICEANCE BASIN  
Planned Location:1995FNL  1899 FWLLat/Long: 39.457005 / -107.819706Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.457005 / -107.819706Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/1/2016
End Date: 11/7/2016
Reported: 11/29/2016
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/21/2016             Measured TD: 9782 ft.    Vertical TD: 9435 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/21/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/9/2018
Proposed Top PZ Location:Sec:7 Twp: 7S 93W Footage: 739 FNL  191 FWL
Bottom Hole Location:Sec:7 Twp: 7S 93W Footage: 739 FNL  191 FWL
Proposed Depth/Form:9764 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 0 ft., Bottom: 1124 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9764 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 792, Top: , Bottom: 9764 ft.

Wellbore Completed
Completion Date:9/21/2016
Spud Date:9/15/2016Spud Date Is:ACTUAL
Measured TD:9782 ft.Measured PB depth:9708 ft.
True Vertical TD:9435 ft.True Vertical PB depth:9361 ft.
Top PZ Location:Sec:7 Twp: 7S 93WFootage: 780 FNL  213 FWL
Bottom Hole Location:Sec:7 Twp: 7S 93WFootage: 754 FNL  157 FWL
Log Types:CBL/MUD/RPM/Triple Combo in 045-23232
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1171 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 310, Top: 0 ft., Bottom: 1171 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9775 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1115, Top: 4598 ft., Bottom: 9775 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3515 ft.
MESAVERDE5876 ft.
OHIO CREEK5876 ft.
WILLIAMS FORK6064 ft.
CAMEO8792 ft.
ROLLINS9630 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/21/2016                Interval Top: 7463 ft.    Interval Bottom: 9547 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/5/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/1/2016Treatment End Date:11/7/2016
Treatment Summary:47904 BBLS Slickwater; 917350 100/mesh; (summary)
Total fluid used in treatment (bbls):47904Max pressure during treatment (psi):5324
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):47904Total flowback volume recovered (bbls):14013
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):917350Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9357 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/21/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1121
CALC_MCF_GAS 1477
CASING_PRESS 2000
MCF_GAS 1477
TUBING_PRESS 1400
Perforation Data:
Interval Top:7463 ft.# Of Holes:264
Interval Bottom:9547 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)110
Total Gas Produced (MCF)50506
GOR459145
GOR DeterminationMCFE
Average BOE per Day24.162
Average MCFE per Day140.135

 Federal Financial Assurance  i 

 Tribal Well  i No