Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-23230
Well Classification: GW Status: PR - 10/1/2016
Well Name/No:Youberg #RU 412-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2016
FacilityID:446083LocationID:323942
County:GARFIELD #045Location:SENW 7 7S93W 6
Field:RULISON - #75400Elevation:7338 ft.
Basin:PICEANCE BASIN  
Planned Location:2007FNL  1894 FWLLat/Long: 39.456966 / -107.819722Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.456966 / -107.819722Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/6/2016
End Date: 10/9/2016
Reported: 10/19/2016
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2016             Measured TD: 9652 ft.    Vertical TD: 9418 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:6/9/2018
Proposed Top PZ Location:Sec:7 Twp: 7S 93W Footage: 2077 FNL  521 FWL
Bottom Hole Location:Sec:7 Twp: 7S 93W Footage: 2077 FNL  521 FWL
Proposed Depth/Form:9626 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 0 ft., Bottom: 1124 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9626 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 789, Top: , Bottom: 9626 ft.

Wellbore Completed
Completion Date:8/27/2016
Spud Date:8/21/2016Spud Date Is:ACTUAL
Measured TD:9652 ft.Measured PB depth:9582 ft.
True Vertical TD:9418 ft.True Vertical PB depth:9348 ft.
Top PZ Location:Sec:7 Twp: 7S 93WFootage: 2204 FNL  543 FWL
Bottom Hole Location:Sec:7 Twp: 7S 93WFootage: 2228 FNL  491 FWL
Log Types:RPM/MUD/CBL/Triple Combo on 045-23232
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.7 , Citings Type: ACTUAL
Cement:Sacks: 33, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1175 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1175 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9645 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1110, Top: 3870 ft., Bottom: 9645 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3423 ft.
MESAVERDE5787 ft.
OHIO CREEK5787 ft.
WILLIAMS FORK5902 ft.
CAMEO8685 ft.
ROLLINS9481 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/24/2016                Interval Top: 7463 ft.    Interval Bottom: 9392 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/9/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/6/2016Treatment End Date:10/9/2016
Treatment Summary:49572 BBLS Slickwater; 940140 100/mesh; (summary)
Total fluid used in treatment (bbls):49572Max pressure during treatment (psi):6991
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):49572Total flowback volume recovered (bbls):15631
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):940140Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9198 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/24/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1098
CALC_MCF_GAS 1624
CASING_PRESS 2400
MCF_GAS 1624
TUBING_PRESS 1675
Perforation Data:
Interval Top:7463 ft.# Of Holes:240
Interval Bottom:9392 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)82
Total Gas Produced (MCF)38784
GOR472975
GOR DeterminationMCFE
Average BOE per Day18.552
Average MCFE per Day107.632

 Federal Financial Assurance  i 

 Tribal Well  i No