Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22880
Well Classification: GW Status: PR - 3/1/2016
Well Name/No:GM #704-32-9-HMB2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date3/1/2016
FacilityID:441719LocationID:333109
County:GARFIELD #045Location:LOT 1 4 7S96W 6
Field:PICEANCE HORIZONTAL MANCOS - #68808Elevation:5460 ft.
Basin:PICEANCE BASIN  
Planned Location:701FNL  916 FELLat/Long: 39.471352 / -108.107307Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.471352 / -108.107307Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/8/2015
End Date: 9/19/2015
Reported: 11/17/2015
Days to report: 59
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2016             Measured TD: 15410 ft.    Vertical TD: 9072 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2016
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/5/2017
Proposed Top PZ Location:Sec: Twp: Footage: 1662 FNL  1309 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96W Footage: 1981 FNL  1646 FEL
Proposed Depth/Form:15450 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: MNCS , Formation: MANCOS , Order: 547-20 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 20 in., Top: 0 ft., Depth: 80 ft., Weight: 52.7# , Citings Type: PLANNED
Cement:Sacks: 30, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 11.75 in., Top: 0 ft., Depth: 2500 ft., Weight: 60# , Citings Type: PLANNED
Cement:Sacks: 516, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 8800 ft., Weight: 42.8# , Citings Type: PLANNED
Cement:Sacks: 862, Top: 3400 ft., Bottom: 8800 ft.
Casing:String Type: S.C. 1.1, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 3400 ft., Weight: 42.8# , Citings Type: PLANNED
Cement:Sacks: 412, Top: 1504 ft., Bottom: 3400 ft.
Casing:String Type: 2ND, Hole Size: 6.25 in., Size: 5.5 in., Top: 0 ft., Depth: 8069 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 0, Top: , Bottom:
Casing:String Type: TAPER, Hole Size: 6.25 in., Size: 4.5 in., Top: 8069 ft., Depth: 15400 ft., Weight: 15.1 , Citings Type: PLANNED
Cement:Sacks: 530, Top: 8168 ft., Bottom: 15400 ft.

Wellbore Completed
Completion Date:7/29/2015
Spud Date:6/14/2015Spud Date Is:ACTUAL
Measured TD:15410 ft.Measured PB depth:15308 ft.
True Vertical TD:9072 ft.True Vertical PB depth:9077 ft.
Top PZ Location:Sec:4 Twp: 7S 96WFootage: 1666 FNL  1288 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96WFootage: 2004 FNL  1670 FEL
Log Types:MWD/CBL/MUD/Triple Combo on 045-21487
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 18 in., Top: 0 ft., Depth: 158 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 47, Top: 0 ft., Bottom: 158 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 11.75 in., Top: 0 ft., Depth: 2515 ft., Weight: 60 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 180 ft., Bottom: 2515 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 9168 ft., Weight: 42.8 , Citings Type: ACTUAL
Cement:Sacks: 1000, Top: 3408 ft., Bottom: 9168 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.625 in., Size: 5.5 in., Top: 0 ft., Depth: 8058 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 530, Top: 6396 ft., Bottom: 8058 ft., Determination Method: CBL
Casing:String Type: TAPER, Hole Size: 6.625 in., Size: 4.5 in., Top: 8058 ft., Depth: 15397 ft., Weight: 15.1 , Citings Type: ACTUAL
Cement:Sacks: , Top: 8058 ft., Bottom: 15397 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1685 ft., Depth: 3408 ft., Bottom: 3408 ft., Sacks: 435, Method: DV TOOL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 180 ft., Bottom: 180 ft., Sacks: 170, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
MESAVERDE3226 ft.
WILLIAMS FORK3226 ft.
CAMEO5651 ft.
ROLLINS6254 ft.
COZZETTE6532 ft.
CORCORAN6772 ft.
SEGO6930 ft.
MANCOS B8815 ft.

Formation MNCS                     Formation Classification:  GW                     Status:  PR - 11/1/2015                 Interval Top: 9755 ft.    Interval Bottom: 15171 ft.

 Completed Information for Formation MANCOS
1st Production Date:9/19/2015Choke Size: 
Formation Name:MANCOSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/8/2015Treatment End Date:9/19/2015
Treatment Summary:41000 Gals 15% HCL; 248345 BBLs Slickwater; 9843546 100/Mesh; 1195136 40/70 Sand; (summary)
Total fluid used in treatment (bbls):249321Max pressure during treatment (psi):11767
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:28
Total acid used in treatment (bbls):976Min frac gradient (psi/ft):0.99
Recycled water used in treatment (bbls):248345Total flowback volume recovered (bbls):28200
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):11038682Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9237 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/1/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 988
CALC_MCF_GAS 5389
CASING_PRESS 3907
MCF_GAS 5389
TUBING_PRESS 3218
Perforation Data:
Interval Top:9755 ft.# Of Holes:672
Interval Bottom:15171 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)226
Total Gas Produced (MCF)185124
GOR819132
GOR DeterminationMCFE
Average BOE per Day88.071
Average MCFE per Day510.792

 Federal Financial Assurance  i Y

 Tribal Well  i No