Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22838
Well Classification: GW Status: PR - 2/1/2023
Well Name/No:BAT #24D-18-07-95
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/1/2023
FacilityID:441499LocationID:422286
County:GARFIELD #045Location:SESE 18 7S95W 6
Field:PARACHUTE - #67350Elevation:5447 ft.
Basin:PICEANCE BASIN  
Planned Location:236FSL  824 FELLat/Long: 39.431071 / -108.033241Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.431071 / -108.033241Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/6/2015
End Date: 7/16/2015
Reported: 7/28/2015
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/1/2023             Measured TD: 6942 ft.    Vertical TD: 6267 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:4/13/2017
Proposed Top PZ Location:Sec:18 Twp: 7S 95W Footage: 215 FSL  1952 FWL
Bottom Hole Location:Sec:18 Twp: 7S 95W Footage: 215 FSL  1952 FWL
Proposed Depth/Form:7105 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-60 , Unit Acreage: 320, Drill Unit: S/2 Sec 18
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: 111, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1879 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 464, Top: 0 ft., Bottom: 1879 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7105 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 550, Top: , Bottom: 7105 ft.

Wellbore Completed
Completion Date:6/15/2015
Spud Date:5/4/2015Spud Date Is:ACTUAL
Measured TD:6942 ft.Measured PB depth:6881 ft.
True Vertical TD:6267 ft.True Vertical PB depth:6206 ft.
Top PZ Location:Sec:18 Twp: 7S 95WFootage: 214 FSL  1946 FWL
Bottom Hole Location:Sec:18 Twp: 7S 95WFootage: 214 FSL  1946 FWL
Log Types:CBL, MUD, PULSED NEUTRON. NO OPEN HOLE LOGS WERE RUN ON THIS WELL. IN ACCORDANCE WITH RULE 317.p.,OPEN HOLE LOGS WERE RUN ON THE BAT 34C-18-07-95 (API # 05-045-20534).
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 77 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 77 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1887 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 410, Top: 0 ft., Bottom: 1887 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 6928 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 900, Top: 2855 ft., Bottom: 6928 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3722 ft.NN
CAMEO6281 ft.NN
ROLLINS6802 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 2/1/2023                  Interval Top: 3914 ft.    Interval Bottom: 6752 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/18/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/6/2015Treatment End Date:7/17/2015
Treatment Summary:Frac'd with 155,161 bbls 2% slickwater and no sand.
Total fluid used in treatment (bbls):155161Max pressure during treatment (psi):7572
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):155161Total flowback volume recovered (bbls):49249
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5347 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/14/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1039
BTU_GAS 1070
CALC_BBLS_H2O 1039
CALC_MCF_GAS 2431
CASING_PRESS 440
MCF_GAS 2431
TUBING_PRESS 1100
Perforation Data:
Interval Top:3914 ft.# Of Holes:540
Interval Bottom:6752 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)39
Total Gas Produced (MCF)56860
GOR1457948
GOR DeterminationMCFE
Average BOE per Day26.996
Average MCFE per Day156.547

 Federal Financial Assurance  i 

 Tribal Well  i No