|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/4/2020 Measured TD: 17600 ft. Vertical TD: 6757 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/4/2020 | | Wellbore Permit | HORIZONTAL | | Permit #: | | Expiration Date: | 2/16/2017 | | Proposed Top PZ Location: | Sec:7 Twp: 8S 98W | Footage: 522 FSL 2118 FWL | | Bottom Hole Location: | Sec:20 Twp: 8S 98W | Footage: 2539 FNL 1851 FWL | | Proposed Depth/Form: | 17585 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEDERAL | | Unit: | Homer Deep Unit | Unit Number: | COC72921X | | Formation And Spacing: | Code: MNCS , Formation: MANCOS , Order: , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: , Citings Type: PLANNED | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 120 ft. | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1001 ft., Weight: 40.5 , Citings Type: PLANNED | | Cement: | Sacks: 469, Top: 0 ft., Bottom: 1001 ft. | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 6583 ft., Weight: 29.7 , Citings Type: PLANNED | | Cement: | Sacks: 928, Top: , Bottom: 6583 ft. | | Casing: | String Type: 2ND, Hole Size: 6.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6350 ft., Weight: 17 , Citings Type: PLANNED | | Cement: | Sacks: , Top: , Bottom: | | Casing: | String Type: TAPER, Hole Size: 6.75 in., Size: 4.5 in., Top: 6383 ft., Depth: 17435 ft., Weight: 11.6 , Citings Type: PLANNED | | Cement: | Sacks: 1330, Top: 6383 ft., Bottom: 17435 ft. |
| | |
| Wellbore Completed | | Completion Date: | 8/29/2015 | | Spud Date: | 4/1/2015 | Spud Date Is: | ACTUAL | | Measured TD: | 17600 ft. | Measured PB depth: | 17584 ft. | | True Vertical TD: | 6757 ft. | True Vertical PB depth: | 6757 ft. | | Top PZ Location: | Sec:7 Twp: 8S 98W | Footage: 522 FSL 2118 FWL | | Bottom Hole Location: | Sec:20 Twp: 8S 98W | Footage: 2539 FNL 1851 FWL | | Log Types: | CBL; Open-hole logs run on Homer Deep Unit 7-23CH (045-22811) | | Log Types: | CBL, MWD | | Casing: | String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: Line , Citings Type: ACTUAL | | Cement: | Sacks: 320, Top: 0 ft., Bottom: 120 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1006 ft., Weight: 40.5 , Citings Type: ACTUAL | | Cement: | Sacks: 400, Top: 0 ft., Bottom: 1006 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 6567 ft., Weight: 29.7 , Citings Type: ACTUAL | | Cement: | Sacks: 685, Top: 2600 ft., Bottom: 6567 ft., Determination Method: CBL | | Casing: | String Type: 2ND, Hole Size: 6.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6188 ft., Weight: 20 , Citings Type: ACTUAL | | Cement: | Sacks: , Top: , Bottom: , Determination Method: CBL | | Casing: | String Type: TAPER, Hole Size: 6.75 in., Size: 4.5 in., Top: 6188 ft., Depth: 17584 ft., Weight: 13.5 , Citings Type: ACTUAL | | Cement: | Sacks: 1420, Top: 6580 ft., Bottom: 17588 ft., Determination Method: CBL | | Additional Cement: | String Type: 1ST , Top: 2598 ft., Depth: 3608 ft., Bottom: 3608 ft., Sacks: 545, Method: STAGE TOOL | | Additional Cement: | String Type: S.C. 1.1 , Top: 2600 ft., Depth: 3608 ft., Bottom: 3608 ft., Sacks: 545, Method: DV TOOL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | MESAVERDE | 890 ft. | 3866 ft. | N | N | | CAMEO COALS-MESAVERDE | 3023 ft. | | | | | ROLLINS | 3236 ft. | | | | | COZZETTE | 3415 ft. | | | | | CORCORAN | 3657 ft. | | | | | MANCOS | 3866 ft. | | | | | MANCOS A | 4413 ft. | | | | | MANCOS B | 5517 ft. | | | | | NIOBRARA | 6495 ft. | | | |
Formation NBRR Formation Classification: GW Status: PR - 8/4/2020 Interval Top: 7408 ft. Interval Bottom: 17361 ft.| Completed Information for Formation NIOBRARA | | 1st Production Date: | 7/21/2017 | Choke Size: | | | Formation Name: | NIOBRARA | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 6/12/2017 | Treatment End Date: | 6/25/2017 | | Treatment Summary: | 1237 bbls 15% HCL, 687516 bbls slickwater, 1541620# 100 Mesh, 16143830# 40/70 whitesand. | | Total fluid used in treatment (bbls): | 687516 | Max pressure during treatment (psi): | 8163 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | | | Type Of gas: | | Number Of staged intervals: | 50 | | Total acid used in treatment (bbls): | 1237 | Min frac gradient (psi/ft): | | | Recycled water used in treatment (bbls): | | Total flowback volume recovered (bbls): | 35059 | | Fresh water used in treatment (bbls): | 688098 | Disposition method For flowback: | DISPOSAL | | Total proppant used (lbs): | 17685450 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 7390 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | | | Hours Tested: | | Gas Type: | | | Gas Disposal: | | |
| Test Type | Measure |
|---|
| BTU_GAS | 1111 | | CALC_BBLS_H2O | 11066 | | CALC_MCF_GAS | 7000 | | CASING_PRESS | 2400 |
| | Perforation Data: | | Interval Top: | 7408 ft. | # Of Holes: | 1456 | | Interval Bottom: | 17361 ft. | Hole Size: | 0 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 26 |
| Total Gas Produced (MCF) | 347651 |
| GOR | 13371192 |
| GOR Determination | MCFE |
| Average BOE per Day | 164.289 |
| Average MCFE per Day | 952.877 |
| Federal Financial Assurance | i | Y |
|
|