Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22787
Well Classification: GW Status: PR - 5/12/2016
Well Name/No:Federal RU #14-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC41916
Facility Status:PRStatus Date5/12/2016
FacilityID:159708LocationID:159692
County:GARFIELD #045Location:NENW 8 7S93W 6
Field:RULISON - #75400Elevation:7738 ft.
Basin:PICEANCE BASIN  
Planned Location:643FNL  1888 FWLLat/Long: 39.465445 / -107.800935Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465445 / -107.800935Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/21/2016
End Date: 5/4/2016
Reported: 5/19/2016
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/12/2016             Measured TD: 10239 ft.    Vertical TD: 10013 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/12/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/15/2017
Proposed Top PZ Location:Sec:5 Twp: 7S 93W Footage: 489 FSL  667 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93W Footage: 489 FSL  677 FWL
Proposed Depth/Form:10156 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: 403, Drill Unit: Sec 5 ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 315, Top: 0 ft., Bottom: 1200 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10292 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 973, Top: 6362 ft., Bottom: 10292 ft.

Wellbore Completed
Completion Date:12/4/2015
Spud Date:11/26/2015Spud Date Is:ACTUAL
Measured TD:10239 ft.Measured PB depth:10198 ft.
True Vertical TD:10013 ft.True Vertical PB depth:9972 ft.
Top PZ Location:Sec:5 Twp: 7S 93WFootage: 504 FSL  688 FWL
Bottom Hole Location:Sec:5 Twp: 7S 93WFootage: 463 FSL  655 FWL
Log Types:RPM/MUD/CBL/Triple Combo on 045-22773
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1214 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1214 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10229 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 5636 ft., Bottom: 10229 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3813 ft.
MESAVERDE6392 ft.
WILLIAMS FORK6392 ft.
CAMEO9271 ft.
ROLLINS10058 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/12/2016                 Interval Top: 7596 ft.    Interval Bottom: 9909 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/27/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/21/2016Treatment End Date:5/4/2016
Treatment Summary:500 Gals 7.5% HCL; 94096 BBLs Slickwater; 1717589 100/mesh; 91049 40/70 Sand; (summary)
Total fluid used in treatment (bbls):94108Max pressure during treatment (psi):6159
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.63
Recycled water used in treatment (bbls):94096Total flowback volume recovered (bbls):25999
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1808638Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9684 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/12/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1071
CALC_MCF_GAS 2219
CASING_PRESS 2600
MCF_GAS 2219
TUBING_PRESS 1850
Perforation Data:
Interval Top:7596 ft.# Of Holes:264
Interval Bottom:9909 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)92
Total Gas Produced (MCF)71164
GOR773521
GOR DeterminationMCFE
Average BOE per Day33.869
Average MCFE per Day196.435

 Federal Financial Assurance  i Y

 Tribal Well  i No