Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22773
Well Classification: GW Status: PR - 4/1/2025
Well Name/No:Federal RU #31-8
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50944
Facility Status:PRStatus Date4/1/2025
FacilityID:159665LocationID:159692
County:GARFIELD #045Location:NENW 8 7S93W 6
Field:RULISON - #75400Elevation:6638 ft.
Basin:PICEANCE BASIN  
Planned Location:626FNL  1925 FWLLat/Long: 39.465492 / -107.800812Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465492 / -107.800811Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2016
End Date: 6/5/2016
Reported: 6/15/2016
Days to report: 10
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 4/1/2025             Measured TD: 10121 ft.    Vertical TD: 9989 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 4/1/2025
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/14/2017
Proposed Top PZ Location:Sec:8 Twp: 7S 93W Footage: 255 FNL  2127 FEL
Bottom Hole Location:Sec:8 Twp: 7S 93W Footage: 255 FNL  2127 FEL
Proposed Depth/Form:10130 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: 480, Drill Unit: E2, N2NW, S2SW
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1200 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 315, Top: 0 ft., Bottom: 1200 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10104 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 981, Top: 6048 ft., Bottom: 10104 ft.

Wellbore Completed
Completion Date:2/16/2016
Spud Date:2/10/2016Spud Date Is:ACTUAL
Measured TD:10121 ft.Measured PB depth:10080 ft.
True Vertical TD:9989 ft.True Vertical PB depth:9948 ft.
Top PZ Location:Sec:8 Twp: 7S 93WFootage: 267 FNL  2134 FEL
Bottom Hole Location:Sec:8 Twp: 7S 93WFootage: 267 FNL  2134 FEL
Log Types:CBL/MUD/Triple Combo
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1218 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 1218 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 10111 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1080, Top: 4574 ft., Bottom: 10111 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3770 ft.
MESAVERDE6308 ft.
WILLIAMS FORK6308 ft.
CAMEO9172 ft.
ROLLINS9984 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 4/1/2025                  Interval Top: 7818 ft.    Interval Bottom: 9868 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/25/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/19/2016Treatment End Date:6/5/2016
Treatment Summary:500 Gals HCL; 86284 BBLs Slickwater; 1686384 100/mesh; (summary)
Total fluid used in treatment (bbls):86296Max pressure during treatment (psi):7323
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.47
Recycled water used in treatment (bbls):86284Total flowback volume recovered (bbls):25864
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1686384Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:9616 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/15/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1178
CALC_MCF_GAS 2096
CASING_PRESS 2350
MCF_GAS 2096
TUBING_PRESS 1525
Perforation Data:
Interval Top:7818 ft.# Of Holes:240
Interval Bottom:9868 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)47030
GOR770983
GOR DeterminationMCFE
Average BOE per Day22.303
Average MCFE per Day129.371

 Federal Financial Assurance  i Y

 Tribal Well  i No