Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22758
Well Classification: GW Status: PR - 11/8/2015
Well Name/No:YATER #22B-17-07-95
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date11/8/2015
FacilityID:159635LocationID:159652
County:GARFIELD #045Location:NWSW 17 7S95W 6
Field:PARACHUTE - #67350Elevation:5513 ft.
Basin:PICEANCE BASIN  
Planned Location:1704FSL  1129 FWLLat/Long: 39.435126 / -108.026395Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.435126 / -108.026394Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/3/2015
End Date: 10/12/2015
Reported: 10/21/2015
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 11/8/2015             Measured TD: 7083 ft.    Vertical TD: 6629 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 11/8/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/14/2017
Proposed Top PZ Location:Sec:17 Twp: 7S 95W Footage: 1853 FNL  1980 FWL
Bottom Hole Location:Sec:17 Twp: 7S 95W Footage: 1853 FNL  1980 FWL
Proposed Depth/Form:7238 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-58 , Unit Acreage: 240, Drill Unit: Sec 17 NW, W/2NE
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: 111, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1822 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 376, Top: 0 ft., Bottom: 1822 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7238 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 484, Top: , Bottom: 7238 ft.

Wellbore Completed
Completion Date:7/9/2015
Spud Date:6/25/2015Spud Date Is:ACTUAL
Measured TD:7083 ft.Measured PB depth:7023 ft.
True Vertical TD:6629 ft.True Vertical PB depth:6569 ft.
Top PZ Location:Sec:17 Twp: 7S 95WFootage: 1845 FNL  1954 FWL
Bottom Hole Location:Sec:17 Twp: 7S 95WFootage: 1845 FNL  1954 FWL
Log Types:CBL, MUD, PULSED NEUTRON. TRIPLE COMBO ON API 045-22761
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1840 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 385, Top: 0 ft., Bottom: 1840 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7069 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 930, Top: 1162 ft., Bottom: 7069 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3949 ft.NN
CAMEO6431 ft.NN
ROLLINS6919 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/8/2015                 Interval Top: 4838 ft.    Interval Bottom: 6902 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/26/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/3/2015Treatment End Date:10/12/2015
Treatment Summary:Frac'd with 120,909 bbls 2% slickwater and no proppant. Frac pair with Yater 12B-17-07-95 (05-045-22784).
Total fluid used in treatment (bbls):120909Max pressure during treatment (psi):7462
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):120909Total flowback volume recovered (bbls):21652
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5866 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/8/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1300
BTU_GAS 1050
CALC_BBLS_H2O 1300
CALC_MCF_GAS 2599
CASING_PRESS 750
MCF_GAS 2599
TUBING_PRESS 1700
Perforation Data:
Interval Top:4838 ft.# Of Holes:432
Interval Bottom:6902 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)14
Total Gas Produced (MCF)28791
GOR2056500
GOR DeterminationMCFE
Average BOE per Day13.636
Average MCFE per Day79.094

 Federal Financial Assurance  i 

 Tribal Well  i No