Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22691
Well Classification: GW Status: PR - 12/1/2017
Well Name/No:Federal GM #332-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date12/1/2017
FacilityID:440618LocationID:322536
County:GARFIELD #045Location:SENW 10 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6148 ft.
Basin:PICEANCE BASIN  
Planned Location:2100FNL  1943 FWLLat/Long: 39.453018 / -108.096491Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.453019 / -108.096491Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/9/2017
End Date: 11/12/2017
Reported: 11/27/2017
Days to report: 15
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2017             Measured TD: 6850 ft.    Vertical TD: 6822 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2018
Proposed Top PZ Location:Sec:10 Twp: 7S 96W Footage: 1813 FNL  2301 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96W Footage: 1813 FNL  2301 FWL
Proposed Depth/Form:6884 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 244, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6884 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 602, Top: 3498 ft., Bottom: 6884 ft.

Wellbore Completed
Completion Date:10/2/2017
Spud Date:9/28/2017Spud Date Is:ACTUAL
Measured TD:6850 ft.Measured PB depth:6805 ft.
True Vertical TD:6822 ft.True Vertical PB depth:6777 ft.
Top PZ Location:Sec:10 Twp: 7S 96WFootage: 1790 FNL  2316 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96WFootage: 1837 FNL  2272 FWL
Log Types:CBL/PULSED NEUTRON(TRIPLE COMBO IN 045-22704)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 107 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 178, Top: 0 ft., Bottom: 107 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1010 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1010 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6850 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 830, Top: 3216 ft., Bottom: 6850 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1993 ft.
MESAVERDE3744 ft.
OHIO CREEK3744 ft.
WILLIAMS FORK3866 ft.
CAMEO6404 ft.
ROLLINS6721 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2017                 Interval Top: 4959 ft.    Interval Bottom: 6646 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/30/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/29/2017Treatment End Date:11/3/2017
Treatment Summary:52895 bbls of slickwater; No Proppant; 1109 gals of biocide
Total fluid used in treatment (bbls):52921Max pressure during treatment (psi):5451
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):52895Total flowback volume recovered (bbls):12345
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6483 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/1/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1080
CALC_MCF_GAS 1949
CASING_PRESS 1800
MCF_GAS 1949
TUBING_PRESS 1400
Perforation Data:
Interval Top:4959 ft.# Of Holes:192
Interval Bottom:6646 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)108
Total Gas Produced (MCF)57053
GOR528268
GOR DeterminationMCFE
Average BOE per Day27.248
Average MCFE per Day158.031

 Federal Financial Assurance  i Y

 Tribal Well  i No