Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22686
Well Classification: GW Status: PR - 1/1/2024
Well Name/No:Federal GM #334-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date1/1/2024
FacilityID:440613LocationID:322536
County:GARFIELD #045Location:SENW 10 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6148 ft.
Basin:PICEANCE BASIN  
Planned Location:2139FNL  1862 FWLLat/Long: 39.452909 / -108.096779Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.452909 / -108.096779Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/10/2017
End Date: 7/15/2017
Reported: 8/31/2017
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2024             Measured TD: 8216 ft.    Vertical TD: 6724 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2018
Proposed Top PZ Location:Sec:9 Twp: 7S 96W Footage: 977 FNL  1726 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96W Footage: 977 FNL  1726 FEL
Proposed Depth/Form:7486 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1224 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 294, Top: 0 ft., Bottom: 1224 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8216 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 595, Top: 4867 ft., Bottom: 8216 ft.

Wellbore Completed
Completion Date:6/4/2017
Spud Date:5/30/2017Spud Date Is:ACTUAL
Measured TD:8216 ft.Measured PB depth:8176 ft.
True Vertical TD:6724 ft.True Vertical PB depth:6684 ft.
Top PZ Location:Sec:9 Twp: 7S 96WFootage: 982 FNL  1616 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96WFootage: 990 FNL  1715 FEL
Log Types:CBL/PULSED NEUTRON(TRIPLE COMBO IN 045-22704)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 82 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 137, Top: 0 ft., Bottom: 82 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1217 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 1217 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8216 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 765, Top: 4914 ft., Bottom: 8216 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2983 ft.
MESAVERDE5067 ft.
OHIO CREEK5067 ft.
WILLIAMS FORK5169 ft.
CAMEO7724 ft.
ROLLINS8087 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2024                  Interval Top: 6482 ft.    Interval Bottom: 8017 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/4/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/10/2017Treatment End Date:7/15/2017
Treatment Summary:56651 bbls of slickwater; No Proppant; 2935 gals of biocide
Total fluid used in treatment (bbls):56721Max pressure during treatment (psi):6579
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):56651Total flowback volume recovered (bbls):10980
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BTU_GAS 1090
CALC_MCF_GAS 2200
CASING_PRESS 1750
MCF_GAS 2200
TUBING_PRESS 1500
Perforation Data:
Interval Top:6482 ft.# Of Holes:192
Interval Bottom:8017 ft.Hole Size:0.35 in.

Formation WMFK                     Formation Classification:  OW                     Status:  CM - 12/12/2019                Interval Top: 6239 ft.    Interval Bottom: 6440 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:9/7/2018Choke Size: 
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation WMFK.
Perforation Data:
Interval Top:6239 ft.# Of Holes:24
Interval Bottom:6440 ft.Hole Size:0.35 in.
Primary Well Designation:
Low Producing      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingYProduction Period
10/2024 - 09/2025

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)1
Total Gas Produced (MCF)2261
GOR2261000
GOR DeterminationMCFE
Average BOE per Day1.075
Average MCFE per Day6.214

 Federal Financial Assurance  i Y

 Tribal Well  i No