Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22685
Well Classification: GW Status: PR - 3/1/2022
Well Name/No:Federal GM #411-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date3/1/2022
FacilityID:440612LocationID:322536
County:GARFIELD #045Location:SENW 10 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6148 ft.
Basin:PICEANCE BASIN  
Planned Location:2117FNL  1894 FWLLat/Long: 39.452970 / -108.096666Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.452970 / -108.096666Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/17/2017
End Date: 8/22/2017
Reported: 8/31/2017
Days to report: 9
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2022             Measured TD: 7292 ft.    Vertical TD: 6819 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2022
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2018
Proposed Top PZ Location:Sec:10 Twp: 7S 96W Footage: 847 FNL  324 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96W Footage: 847 FNL  324 FWL
Proposed Depth/Form:7306 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 23, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1026 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 250, Top: 0 ft., Bottom: 1026 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7306 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 605, Top: 3902 ft., Bottom: 7306 ft.

Wellbore Completed
Completion Date:7/10/2017
Spud Date:7/6/2017Spud Date Is:ACTUAL
Measured TD:7292 ft.Measured PB depth:7278 ft.
True Vertical TD:6819 ft.True Vertical PB depth:6805 ft.
Top PZ Location:Sec:10 Twp: 7S 96WFootage: 833 FNL  350 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96WFootage: 876 FNL  307 FWL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22704
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 145, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1040 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 1040 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7292 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 835, Top: 3844 ft., Bottom: 7292 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2232 ft.
MESAVERDE4167 ft.
OHIO CREEK4167 ft.
WILLIAMS FORK4370 ft.
CAMEO6757 ft.
ROLLINS7133 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2022                  Interval Top: 5400 ft.    Interval Bottom: 7060 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/5/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/17/2017Treatment End Date:8/22/2017
Treatment Summary:58244 bbls of slickwater; 1105740 100/Mesh; 4090 gals of biocide
Total fluid used in treatment (bbls):58341Max pressure during treatment (psi):6026
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):58244Total flowback volume recovered (bbls):12896
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1105740Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6880 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/5/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1105
CALC_MCF_GAS 2143
CASING_PRESS 1800
MCF_GAS 2143
TUBING_PRESS 1700
Perforation Data:
Interval Top:5400 ft.# Of Holes:192
Interval Bottom:7060 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)81
Total Gas Produced (MCF)42759
GOR527888
GOR DeterminationMCFE
Average BOE per Day20.514
Average MCFE per Day118.979

 Federal Financial Assurance  i Y

 Tribal Well  i No