Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22671
Well Classification: GW Status: PR - 8/11/2017
Well Name/No:Federal GM #12-10
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date8/11/2017
FacilityID:440598LocationID:322536
County:GARFIELD #045Location:SENW 10 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6148 ft.
Basin:PICEANCE BASIN  
Planned Location:2124FNL  1872 FWLLat/Long: 39.452949 / -108.096741Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.452949 / -108.096741Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/25/2017
End Date: 7/28/2017
Reported: 8/31/2017
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/11/2017             Measured TD: 7144 ft.    Vertical TD: 6798 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/11/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/11/2018
Proposed Top PZ Location:Sec:10 Twp: 7S 96W Footage: 1519 FNL  312 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96W Footage: 1519 FNL  312 FWL
Proposed Depth/Form:7146 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 35, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 935 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 252, Top: 0 ft., Bottom: 935 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7146 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 599, Top: 3776 ft., Bottom: 7146 ft.

Wellbore Completed
Completion Date:6/18/2017
Spud Date:6/15/2017Spud Date Is:ACTUAL
Measured TD:7144 ft.Measured PB depth:7100 ft.
True Vertical TD:6798 ft.True Vertical PB depth:6754 ft.
Top PZ Location:Sec:10 Twp: 7S 96WFootage: 1503 FNL  342 FWL
Bottom Hole Location:Sec:10 Twp: 7S 96WFootage: 1563 FNL  301 FWL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22704
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 112 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 187, Top: 0 ft., Bottom: 112 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13 in., Size: 9.625 in., Top: 0 ft., Depth: 1076 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 285, Top: 0 ft., Bottom: 1076 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7144 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 775, Top: 3840 ft., Bottom: 7144 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2403 ft.
MESAVERDE4024 ft.
OHIO CREEK4024 ft.
WILLIAMS FORK4101 ft.
CAMEO6599 ft.
ROLLINS6971 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/11/2017                 Interval Top: 5225 ft.    Interval Bottom: 6902 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/15/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/25/2017Treatment End Date:7/28/2017
Treatment Summary:55169 bbls of slickwater; 1050561 100/Mesh; 3790 gals of biocide
Total fluid used in treatment (bbls):55259Max pressure during treatment (psi):4791
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:8
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):55169Total flowback volume recovered (bbls):10900
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1050561Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6752 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/11/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1096
CALC_MCF_GAS 1541
CASING_PRESS 1460
MCF_GAS 1541
TUBING_PRESS 1450
Perforation Data:
Interval Top:5225 ft.# Of Holes:192
Interval Bottom:6902 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)66
Total Gas Produced (MCF)34828
GOR527696
GOR DeterminationMCFE
Average BOE per Day16.635
Average MCFE per Day96.478

 Federal Financial Assurance  i Y

 Tribal Well  i No