Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22669
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:GM #333-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date7/1/2024
FacilityID:440596LocationID:334816
County:GARFIELD #045Location:LOT 7 5 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5977 ft.
Basin:PICEANCE BASIN  
Planned Location:721FSL  912 FELLat/Long: 39.461011 / -108.125575Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461010 / -108.125575Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/21/2017
End Date: 11/27/2017
Reported: 12/18/2017
Days to report: 21
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 7163 ft.    Vertical TD: 6645 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/12/2019
Proposed Top PZ Location:Sec:5 Twp: 7S 96W Footage: 2120 FSL  2343 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96W Footage: 2120 FSL  2343 FEL
Proposed Depth/Form:7297 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 142, Top: 0 ft., Bottom: 85 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1198 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 289, Top: 0 ft., Bottom: 1189 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7192 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 592, Top: 3870 ft., Bottom: 7192 ft.

Wellbore Completed
Completion Date:9/21/2017
Spud Date:9/17/2017Spud Date Is:ACTUAL
Measured TD:7163 ft.Measured PB depth:7122 ft.
True Vertical TD:6645 ft.True Vertical PB depth:6604 ft.
Top PZ Location:Sec:5 Twp: 7S 96WFootage: 2137 FSL  2314 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96WFootage: 2099 FSL  2370 FEL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22668
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 109 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 182, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1212 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 1212 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7158 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 865, Top: 2433 ft., Bottom: 7158 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2327 ft.
MESAVERDE4043 ft.
OHIO CREEK4043 ft.
WILLIAMS FORK4252 ft.
CAMEO6675 ft.
ROLLINS7035 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/1/2024                  Interval Top: 5209 ft.    Interval Bottom: 6952 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/13/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/21/2017Treatment End Date:11/27/2017
Treatment Summary:82096 bbls of slickwater; 1585005 100/Mesh; 2040 gals of biocide
Total fluid used in treatment (bbls):82145Max pressure during treatment (psi):5432
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):82096Total flowback volume recovered (bbls):15368
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1585005Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6778 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/17/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1079
CALC_MCF_GAS 3134
CASING_PRESS 1705
MCF_GAS 3134
TUBING_PRESS 1500
Perforation Data:
Interval Top:5209 ft.# Of Holes:216
Interval Bottom:6952 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)23147
GOR609131
GOR DeterminationMCFE
Average BOE per Day11.042
Average MCFE per Day64.023

 Federal Financial Assurance  i Y

 Tribal Well  i No