Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22661
Well Classification: GW Status: PR - 7/1/2024
Well Name/No:GM #334-5
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date7/1/2024
FacilityID:440588LocationID:334816
County:GARFIELD #045Location:LOT 7 5 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5977 ft.
Basin:PICEANCE BASIN  
Planned Location:683FSL  935 FELLat/Long: 39.460906 / -108.125658Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.460905 / -108.125658Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/16/2017
End Date: 11/18/2017
Reported: 12/12/2017
Days to report: 24
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2024             Measured TD: 6875 ft.    Vertical TD: 6541 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2024
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/12/2019
Proposed Top PZ Location:Sec:5 Twp: 7S 96W Footage: 656 FSL  2352 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96W Footage: 656 FSL  2352 FEL
Proposed Depth/Form:6779 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 160, Drill Unit: SE4 OF SEC. 5
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 85 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 142, Top: 0 ft., Bottom: 85 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 244, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6921 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 586, Top: 3626 ft., Bottom: 6921 ft.

Wellbore Completed
Completion Date:10/11/2017
Spud Date:10/8/2017Spud Date Is:ACTUAL
Measured TD:6875 ft.Measured PB depth:6834 ft.
True Vertical TD:6541 ft.True Vertical PB depth:6500 ft.
Top PZ Location:Sec:5 Twp: 7S 96WFootage: 685 FSL  2331 FEL
Bottom Hole Location:Sec:5 Twp: 7S 96WFootage: 627 FSL  2359 FEL
Log Types:CBL/PULSED NEUTRON LOG/TRIPLE COMBO IN 045-22668
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 109 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 182, Top: 0 ft., Bottom: 109 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1015 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1015 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6875 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 860, Top: 3400 ft., Bottom: 6875 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2353 ft.
MESAVERDE3932 ft.
OHIO CREEK3932 ft.
WILLIAMS FORK4049 ft.
CAMEO6423 ft.
ROLLINS6766 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2025                  Interval Top: 4980 ft.    Interval Bottom: 6696 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/14/2017Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/16/2017Treatment End Date:11/18/2017
Treatment Summary:43368 bbls of slickwater; 787800 100/Mesh; 926 gals of biocide
Total fluid used in treatment (bbls):43390Max pressure during treatment (psi):5776
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.65
Recycled water used in treatment (bbls):43368Total flowback volume recovered (bbls):18299
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):787800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6513 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:12/13/2017Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 2470
CASING_PRESS 1350
MCF_GAS 2470
TUBING_PRESS 1350
Perforation Data:
Interval Top:4980 ft.# Of Holes:216
Interval Bottom:6696 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)17
Total Gas Produced (MCF)10104
GOR594352
GOR DeterminationMCFE
Average BOE per Day4.829
Average MCFE per Day28.033

 Federal Financial Assurance  i Y

 Tribal Well  i No