Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22639
Well Classification: GW Status: PR - 8/6/2018
Well Name/No:Federal GM #524-11
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC27874
Facility Status:PRStatus Date8/6/2018
FacilityID:439911LocationID:323872
County:GARFIELD #045Location:NESW 11 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5792 ft.
Basin:PICEANCE BASIN  
Planned Location:1999FSL  2272 FWLLat/Long: 39.450212 / -108.078618Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.450212 / -108.078618Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/19/2018
End Date: 7/27/2018
Reported: 8/21/2018
Days to report: 25
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/6/2018             Measured TD: 7110 ft.    Vertical TD: 6455 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/6/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:1/8/2019
Proposed Top PZ Location:Sec:11 Twp: 7S 96W Footage: 150 FSL  968 FWL
Bottom Hole Location:Sec:11 Twp: 7S 96W Footage: 150 FSL  968 FWL
Proposed Depth/Form:7110 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 266, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7117 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 574, Top: 3780 ft., Bottom: 7117 ft.

Wellbore Completed
Completion Date:7/8/2018
Spud Date:7/5/2018Spud Date Is:ACTUAL
Measured TD:7110 ft.Measured PB depth:7075 ft.
True Vertical TD:6455 ft.True Vertical PB depth:6419 ft.
Top PZ Location:Sec:11 Twp: 7S 96WFootage: 180 FSL  995 FWL
Bottom Hole Location:Sec:11 Twp: 7S 6WFootage: 136 FSL  964 FWL
Log Types:CBL, PULSED NEUTRON (TRIPLE COMBO IN API 045-22636)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 66 ft., Weight: 47.44 , Citings Type: ACTUAL
Cement:Sacks: 110, Top: 0 ft., Bottom: 66 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1037 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 1037 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7105 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 3200 ft., Bottom: 7110 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1867 ft.
MESAVERDE3967 ft.
OHIO CREEK3967 ft.
WILLIAMS FORK4159 ft.
CAMEO6585 ft.
ROLLINS7022 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/6/2018                  Interval Top: 5243 ft.    Interval Bottom: 6950 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/7/2018Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/19/2018Treatment End Date:7/27/2018
Treatment Summary:54541 bbls of slickwater; No Proppant; 1384 gals of biocide
Total fluid used in treatment (bbls):54574Max pressure during treatment (psi):4934
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:9
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):54541Total flowback volume recovered (bbls):19440
Fresh water used in treatment (bbls):33Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6778 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/6/2018Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1095
CALC_MCF_GAS 2859
CASING_PRESS 1590
MCF_GAS 2859
TUBING_PRESS 1590
Perforation Data:
Interval Top:5243 ft.# Of Holes:216
Interval Bottom:6950 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)110
Total Gas Produced (MCF)74407
GOR676427
GOR DeterminationMCFE
Average BOE per Day35.438
Average MCFE per Day205.538

 Federal Financial Assurance  i Y

 Tribal Well  i No