Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22633
Well Classification: GW Status: PR - 9/21/2015
Well Name/No:Puckett #13A-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date9/21/2015
FacilityID:439885LocationID:439917
County:GARFIELD #045Location:66 2 7S97W 6
Field:GRAND VALLEY - #31290Elevation:8479 ft.
Basin:PICEANCE BASIN  
Planned Location:2222FNL  628 FELLat/Long: 39.475692 / -108.180228Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475689 / -108.180228Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/13/2015
End Date: 9/18/2015
Reported: 1/4/2016
Days to report: 108
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/21/2015             Measured TD: 9020 ft.    Vertical TD: 8918 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/21/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:1 Twp: 7S 97W Footage: 2636 FNL  405 FWL
Bottom Hole Location:Sec:1 Twp: 7S 97W Footage: 2636 FNL  405 FWL
Proposed Depth/Form:9043 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 75 ft., Weight: 52.8 , Citings Type: PLANNED
Cement:Sacks: 108, Top: 0 ft., Bottom: 75 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1172, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9000 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 960, Top: , Bottom: 9000 ft.

Wellbore Completed
Completion Date:7/10/2015
Spud Date:7/4/2015Spud Date Is:ACTUAL
Measured TD:9020 ft.Measured PB depth:8963 ft.
True Vertical TD:8918 ft.True Vertical PB depth:8861 ft.
Top PZ Location:Sec:1 Twp: 7S 97WFootage: 2637 FNL  433 FWL
Bottom Hole Location:Sec:1 Twp: 7S 97WFootage: 2595 FSL  396 FWL
Log Types:RST/CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 127 ft., Weight: 106.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2537 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 467 ft., Bottom: 2537 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8999 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 3292 ft., Bottom: 8999 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 0 ft., Bottom: 467 ft., Sacks: 150, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK5940 ft.6212 ft.NN
WILLIAMS FORK6212 ft.8814 ft.NN
ROLLINS8814 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/21/2015                 Interval Top: 7057 ft.    Interval Bottom: 8774 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/21/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/13/2015Treatment End Date:9/18/2015
Treatment Summary:Frac'd with 56,000bbls slickwater and 84bbls of 7.5% HCL acid
Total fluid used in treatment (bbls):56084Max pressure during treatment (psi):6910
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):84Min frac gradient (psi/ft):0.50
Recycled water used in treatment (bbls):56000Total flowback volume recovered (bbls):6147
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8528 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/21/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 2705
BTU_GAS 1080
CALC_BBLS_H2O 2705
CALC_MCF_GAS 1146
CASING_PRESS 575
MCF_GAS 1146
Perforation Data:
Interval Top:7057 ft.# Of Holes:189
Interval Bottom:8774 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)28
Total Gas Produced (MCF)46225
GOR1650892
GOR DeterminationMCFE
Average BOE per Day21.918
Average MCFE per Day127.122

 Federal Financial Assurance  i 

 Tribal Well  i No