Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22623
Well Classification: GW Status: PR - 1/1/2021
Well Name/No:Puckett #41D-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2021
FacilityID:439873LocationID:439917
County:GARFIELD #045Location:66 2 7S97W 6
Field:GRAND VALLEY - #31290Elevation:8477 ft.
Basin:PICEANCE BASIN  
Planned Location:2175FNL  661 FELLat/Long: 39.475819 / -108.180342Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.475808 / -108.180336Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/13/2015
End Date: 10/15/2015
Reported: 1/4/2016
Days to report: 81
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2021             Measured TD: 8962 ft.    Vertical TD: 8871 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2021
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:2 Twp: 7S 97W Footage: 1183 FNL  1153 FEL
Bottom Hole Location:Sec:2 Twp: 7S 97W Footage: 1183 FNL  1153 FEL
Proposed Depth/Form:8992 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: 640, Drill Unit: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 75 ft., Weight: 52.8 , Citings Type: PLANNED
Cement:Sacks: 108, Top: 0 ft., Bottom: 75 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1172, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8992 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 721, Top: , Bottom: 8992 ft.

Wellbore Completed
Completion Date:5/22/2015
Spud Date:5/17/2015Spud Date Is:ACTUAL
Measured TD:8962 ft.Measured PB depth:8897 ft.
True Vertical TD:8871 ft.True Vertical PB depth:8807 ft.
Top PZ Location:Sec:2 Twp: 7S 97WFootage: 1176 FNL  1125 FEL
Bottom Hole Location:Sec:2 Twp: 7S 97WFootage: 1190 FNL  1163 FEL
Log Types:RST/CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 127 ft., Weight: 106.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 127 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2515 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 750 ft., Bottom: 2515 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8934 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 960, Top: 2750 ft., Bottom: 8934 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 0 ft., Bottom: 750 ft., Sacks: 241, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK5928 ft.6194 ft.NN
WILLIAMS FORK6194 ft.8810 ft.NN
ROLLINS8810 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2021                  Interval Top: 7087 ft.    Interval Bottom: 8778 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/21/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/13/2015Treatment End Date:10/15/2015
Treatment Summary:Frac'd with 56,000bbls slickwater and 84bbls of 7.5% HCL acid
Total fluid used in treatment (bbls):56084Max pressure during treatment (psi):6700
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):84Min frac gradient (psi/ft):0.53
Recycled water used in treatment (bbls):56000Total flowback volume recovered (bbls):11954
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8555 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/27/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 459
BTU_GAS 1080
CALC_BBLS_H2O 459
CALC_MCF_GAS 2710
CASING_PRESS 1555
MCF_GAS 2710
TUBING_PRESS 480
Perforation Data:
Interval Top:7087 ft.# Of Holes:189
Interval Bottom:8778 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)20
Total Gas Produced (MCF)32713
GOR1635650
GOR DeterminationMCFE
Average BOE per Day15.512
Average MCFE per Day89.973

 Federal Financial Assurance  i 

 Tribal Well  i No