Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22613
Well Classification: GW Status: PR - 7/1/2016
Well Name/No:Puckett #24C-1
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2016
FacilityID:439862LocationID:335017
County:GARFIELD #045Location:SESE 2 7S97W 6
Field:GRAND VALLEY - #31290Elevation:8433 ft.
Basin:PICEANCE BASIN  
Planned Location:1074FSL  317 FELLat/Long: 39.470292 / -108.179086Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.470295 / -108.179082Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/31/2016
End Date: 6/3/2016
Reported: 7/11/2016
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2016             Measured TD: 9290 ft.    Vertical TD: 8833 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:1 Twp: 7S 97W Footage: 488 FSL  2051 FWL
Bottom Hole Location:Sec:1 Twp: 7S 97W Footage: 488 FSL  2051 FWL
Proposed Depth/Form:9302 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-21 , Unit Acreage: 640, Drill Unit: Sec 1 All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 75 ft., Weight: 52.8 , Citings Type: PLANNED
Cement:Sacks: 108, Top: 0 ft., Bottom: 75 ft.
Casing:String Type: SURF, Hole Size: 16 in., Size: 9.625 in., Top: 0 ft., Depth: 2500 ft., Weight: 36 , Citings Type: PLANNED
Cement:Sacks: 1533, Top: 0 ft., Bottom: 2500 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9302 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 795, Top: 5576 ft., Bottom: 9302 ft.

Wellbore Completed
Completion Date:12/22/2015
Spud Date:12/16/2015Spud Date Is:ACTUAL
Measured TD:9290 ft.Measured PB depth:9218 ft.
True Vertical TD:8833 ft.True Vertical PB depth:8762 ft.
Top PZ Location:Sec:1 Twp: 7S 97WFootage: 530 FSL  1967 FWL
Bottom Hole Location:Sec:1 Twp: 7S 97WFootage: 479 FSL  2092 FWL
Log Types:PNL, CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 128 ft., Weight: 106.5 , Citings Type: ACTUAL
Cement:Sacks: 200, Top: 0 ft., Bottom: 128 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 9.625 in., Top: 0 ft., Depth: 2548 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 535, Top: 0 ft., Bottom: 2548 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9255 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1050, Top: 3525 ft., Bottom: 9255 ft., Determination Method: CBL
Additional Cement:String Type: SURF , Top: 0 ft., Depth: 0 ft., Bottom: 2548 ft., Sacks: 340, Method: 1 INCH
FormationInterval TopLog BottomCoredDSTs
OHIO CREEK6063 ft.6336 ft.NN
WILLIAMS FORK6336 ft.9102 ft.NN
ROLLINS9102 ft.

Formation WMFK                     Formation Classification:  GW                     Status:  PR - 7/1/2016                  Interval Top: 7526 ft.    Interval Bottom: 9041 ft.

 Completed Information for Formation WILLIAMS FORK
1st Production Date:7/1/2016Choke Size:48.000 in.
Formation Name:WILLIAMS FORKCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/1/2016Treatment End Date:6/3/2016
Treatment Summary:Frac'd with 56,000bbls slickwater and 12bbls of 7.5% HCL acid
Total fluid used in treatment (bbls):56000Max pressure during treatment (psi):7931
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):12Min frac gradient (psi/ft):0.51
Recycled water used in treatment (bbls):56000Total flowback volume recovered (bbls):9666
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8831 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/1/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1264
BTU_GAS 1080
CALC_BBLS_H2O 1264
CALC_MCF_GAS 1436
CASING_PRESS 1861
MCF_GAS 1436
TUBING_PRESS 571
Perforation Data:
Interval Top:7526 ft.# Of Holes:189
Interval Bottom:9041 ft.Hole Size:0.36 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)61
Total Gas Produced (MCF)46188
GOR757180
GOR DeterminationMCFE
Average BOE per Day21.987
Average MCFE per Day127.518

 Federal Financial Assurance  i 

 Tribal Well  i No