Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22611
Well Classification: GW Status: PR - 9/21/2016
Well Name/No:Federal RU #513-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50944
Facility Status:PRStatus Date9/21/2016
FacilityID:439838LocationID:324106
County:GARFIELD #045Location:NWSW 6 7S93W 6
Field:RULISON - #75400Elevation:6985 ft.
Basin:PICEANCE BASIN  
Planned Location:1960FSL  507 FWLLat/Long: 39.467142 / -107.824790Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.467142 / -107.824789Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/8/2016
End Date: 7/16/2016
Reported: 7/28/2016
Days to report: 12
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/21/2016             Measured TD: 9197 ft.    Vertical TD: 9179 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/21/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:6 Twp: 7S 93W Footage: 2215 FSL  542 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93W Footage: 2215 FSL  542 FWL
Proposed Depth/Form:9155 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 0 ft., Bottom: 1124 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9198 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 801, Top: 5198 ft., Bottom: 9198 ft.

Wellbore Completed
Completion Date:4/12/2016
Spud Date:4/7/2016Spud Date Is:ACTUAL
Measured TD:9197 ft.Measured PB depth:9106 ft.
True Vertical TD:9179 ft.True Vertical PB depth:9088 ft.
Top PZ Location:Sec:6 Twp: 7S 93WFootage: 2235 FSL  556 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93WFootage: 2228 FSL  510 FWL
Log Types:MUD/RPM/CBL/Triple combo on 045-22602
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1135 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 305, Top: 0 ft., Bottom: 1135 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9190 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1075, Top: 4058 ft., Bottom: 9190 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2887 ft.
OHIO CREEK5264 ft.
MESAVERDE5398 ft.
WILLIAMS FORK5398 ft.
CAMEO8184 ft.
ROLLINS9019 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 7/25/2016                 Interval Top: 6687 ft.    Interval Bottom: 8932 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/8/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/8/2016Treatment End Date:7/16/2016
Treatment Summary:106617 BBLs Slickwater; 2136400 mesh/100; (summary)
Total fluid used in treatment (bbls):106617Max pressure during treatment (psi):5610
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):106617Total flowback volume recovered (bbls):21931
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):2136400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8714 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/25/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1028
CALC_MCF_GAS 718
CASING_PRESS 2575
MCF_GAS 718
TUBING_PRESS 1800
Perforation Data:
Interval Top:6687 ft.# Of Holes:240
Interval Bottom:8932 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)127
Total Gas Produced (MCF)82989
GOR653456
GOR DeterminationMCFE
Average BOE per Day39.573
Average MCFE per Day229.496

 Federal Financial Assurance  i Y

 Tribal Well  i No