Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22606
Well Classification: GW Status: PR - 9/19/2016
Well Name/No:Federal RU #314-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50944
Facility Status:PRStatus Date9/19/2016
FacilityID:439833LocationID:324106
County:GARFIELD #045Location:NWSW 6 7S93W 6
Field:RULISON - #75400Elevation:6985 ft.
Basin:PICEANCE BASIN  
Planned Location:1938FSL  511 FWLLat/Long: 39.467082 / -107.824773Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.467082 / -107.824773Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2016
End Date: 6/25/2016
Reported: 7/28/2016
Days to report: 33
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/19/2016             Measured TD: 9386 ft.    Vertical TD: 9113 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/19/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:6 Twp: 7S 93W Footage: 227 FSL  831 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93W Footage: 227 FSL  831 FWL
Proposed Depth/Form:9427 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 0 ft., Bottom: 1124 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9411 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 797, Top: 5428 ft., Bottom: 9411 ft.

Wellbore Completed
Completion Date:3/13/2016
Spud Date:3/7/2016Spud Date Is:ACTUAL
Measured TD:9386 ft.Measured PB depth:9283 ft.
True Vertical TD:9113 ft.True Vertical PB depth:9010 ft.
Top PZ Location:Sec:6 Twp: 7S 93WFootage: 255 FSL  840 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93WFootage: 226 FSL  828 FWL
Log Types:CBL/MUD/RPM/Triple combo on 045-22602
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1131 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9376 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1080, Top: 4624 ft., Bottom: 9376 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3074 ft.
MESAVERDE5579 ft.
WILLIAMS FORK5579 ft.
CAMEO8395 ft.
ROLLINS9224 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/10/2016                 Interval Top: 6699 ft.    Interval Bottom: 9168 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/17/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/16/2016Treatment End Date:6/24/2016
Treatment Summary:88358 BBLs Slickwtaer; 1729411 40/70 Sand; (summary)
Total fluid used in treatment (bbls):88358Max pressure during treatment (psi):6273
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:11
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.64
Recycled water used in treatment (bbls):88358Total flowback volume recovered (bbls):19346
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1729411Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8907 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/10/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 969
CALC_MCF_GAS 1265
CASING_PRESS 1197
MCF_GAS 1265
TUBING_PRESS 688
Perforation Data:
Interval Top:6699 ft.# Of Holes:264
Interval Bottom:9168 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)108
Total Gas Produced (MCF)71064
GOR658000
GOR DeterminationMCFE
Average BOE per Day33.869
Average MCFE per Day196.464

 Federal Financial Assurance  i Y

 Tribal Well  i No