Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22595
Well Classification: GW Status: PR - 9/19/2016
Well Name/No:Federal RU #422-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50944
Facility Status:PRStatus Date9/19/2016
FacilityID:439822LocationID:324106
County:GARFIELD #045Location:NWSW 6 7S93W 6
Field:RULISON - #75400Elevation:6985 ft.
Basin:PICEANCE BASIN  
Planned Location:1987FSL  511 FWLLat/Long: 39.467228 / -107.824777Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.467229 / -107.824779Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2016
End Date: 8/8/2016
Reported: 8/10/2016
Days to report: 2
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 9/19/2016             Measured TD: 9490 ft.    Vertical TD: 9216 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 9/19/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:6 Twp: 7S 93W Footage: 1372 FNL  1343 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93W Footage: 1372 FNL  1343 FWL
Proposed Depth/Form:9851 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 0 ft., Bottom: 1124 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9507 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 808, Top: 5468 ft., Bottom: 9507 ft.

Wellbore Completed
Completion Date:5/21/2016
Spud Date:5/16/2016Spud Date Is:ACTUAL
Measured TD:9490 ft.Measured PB depth:9406 ft.
True Vertical TD:9216 ft.True Vertical PB depth:9132 ft.
Top PZ Location:Sec:6 Twp: 7S 93WFootage: 1349 FNL  1367 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93WFootage: 1392 FNL  1329 FWL
Log Types:CBL/MUD/RPM/Triple combo on 045-22602
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1132 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1132 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9480 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1100, Top: 3864 ft., Bottom: 9480 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2946 ft.
OHIO CREEK5541 ft.
MESAVERDE5665 ft.
WILLIAMS FORK5665 ft.
CAMEO8510 ft.
ROLLINS9346 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/17/2016                 Interval Top: 6956 ft.    Interval Bottom: 9335 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/29/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2016Treatment End Date:8/8/2016
Treatment Summary:108164 BBLS Slickwater; 2163549 100/mesh; (summary)
Total fluid used in treatment (bbls):108164Max pressure during treatment (psi):8207
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.68
Recycled water used in treatment (bbls):108164Total flowback volume recovered (bbls):30244
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):2163549Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8919 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1052
CALC_MCF_GAS 1357
CASING_PRESS 2750
MCF_GAS 1357
TUBING_PRESS 1850
Perforation Data:
Interval Top:6956 ft.# Of Holes:240
Interval Bottom:9335 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)90
Total Gas Produced (MCF)59165
GOR657388
GOR DeterminationMCFE
Average BOE per Day28.211
Average MCFE per Day163.625

 Federal Financial Assurance  i Y

 Tribal Well  i No