Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22593
Well Classification: GW Status: PR - 8/17/2016
Well Name/No:Federal RU #22-6
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC50944
Facility Status:PRStatus Date8/17/2016
FacilityID:439820LocationID:324106
County:GARFIELD #045Location:NWSW 6 7S93W 6
Field:RULISON - #75400Elevation:6985 ft.
Basin:PICEANCE BASIN  
Planned Location:1994FSL  509 FWLLat/Long: 39.467249 / -107.824783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.467248 / -107.824784Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/29/2016
End Date: 8/7/2016
Reported: 8/10/2016
Days to report: 3
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/17/2016             Measured TD: 9763 ft.    Vertical TD: 9371 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/17/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/13/2016
Proposed Top PZ Location:Sec:6 Twp: 7S 93W Footage: 925 FNL  1314 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93W Footage: 925 FNL  1314 FWL
Proposed Depth/Form:9609 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-76 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1124 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 296, Top: 0 ft., Bottom: 1124 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9760 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 830, Top: 5611 ft., Bottom: 9760 ft.

Wellbore Completed
Completion Date:5/4/2016
Spud Date:4/28/2016Spud Date Is:ACTUAL
Measured TD:9763 ft.Measured PB depth:9674 ft.
True Vertical TD:9371 ft.True Vertical PB depth:9282 ft.
Top PZ Location:Sec:6 Twp: 7S 93WFootage: 902 FNL  1335 FWL
Bottom Hole Location:Sec:6 Twp: 7S 93WFootage: 909 FNL  1305 FWL
Log Types:CBL/MUD/RPM/Triple combo on 045-22602
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 22, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1131 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1131 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 9751 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1125, Top: 4063 ft., Bottom: 9751 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G3096 ft.
OHIO CREEK5609 ft.
MESAVERDE5782 ft.
WILLIAMS FORK5782 ft.
CAMEO8691 ft.
ROLLINS9484 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/17/2016                 Interval Top: 7116 ft.    Interval Bottom: 9411 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/8/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/29/2016Treatment End Date:8/7/2016
Treatment Summary:106633 BBLS Slickwater; 2137665 mesh/100; (summary)
Total fluid used in treatment (bbls):106633Max pressure during treatment (psi):6401
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.72
Recycled water used in treatment (bbls):106633Total flowback volume recovered (bbls):28308
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):2137665Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:8995 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/17/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1153
CALC_MCF_GAS 1299
CASING_PRESS 2750
MCF_GAS 1299
TUBING_PRESS 1700
Perforation Data:
Interval Top:7116 ft.# Of Holes:240
Interval Bottom:9411 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)71
Total Gas Produced (MCF)47595
GOR670352
GOR DeterminationMCFE
Average BOE per Day22.686
Average MCFE per Day131.575

 Federal Financial Assurance  i Y

 Tribal Well  i No