Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22536
Well Classification: GW Status: PR - 10/1/2016
Well Name/No:Federal GM #532-9
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24603
Facility Status:PRStatus Date10/1/2016
FacilityID:439497LocationID:334717
County:GARFIELD #045Location:NWNW 9 7S96W 6
Field:GRAND VALLEY - #31290Elevation:6087 ft.
Basin:PICEANCE BASIN  
Planned Location:656FNL  570 FWLLat/Long: 39.456877 / -108.119924Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.456877 / -108.119924Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 8/24/2016
End Date: 8/28/2016
Reported: 9/19/2016
Days to report: 22
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2016             Measured TD: 7934 ft.    Vertical TD: 6578 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/28/2016
Proposed Top PZ Location:Sec:9 Twp: 7S 96W Footage: 2273 FNL  1641 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96W Footage: 2273 FNL  1641 FEL
Proposed Depth/Form:7952 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-9 , Unit Acreage: 320, Drill Unit: Sec 9 N/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2029 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 520, Top: 0 ft., Bottom: 2029 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7952 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 748, Top: 4658 ft., Bottom: 7952 ft.

Wellbore Completed
Completion Date:7/10/2016
Spud Date:7/5/2016Spud Date Is:ACTUAL
Measured TD:7934 ft.Measured PB depth:7922 ft.
True Vertical TD:6578 ft.True Vertical PB depth:6566 ft.
Top PZ Location:Sec:9 Twp: 7S 96WFootage: 2224 FNL  1671 FEL
Bottom Hole Location:Sec:9 Twp: 7S 96WFootage: 2258 FNL  1614 FEL
Log Types:CBL/MUD/RPM/Triple Combo on 045-22531
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 87 ft., Weight: 47.4 , Citings Type: ACTUAL
Cement:Sacks: 33, Top: 0 ft., Bottom: 87 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 2078 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 560, Top: 0 ft., Bottom: 2078 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7924 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 850, Top: 3807 ft., Bottom: 7924 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2305 ft.
OHIO CREEK4823 ft.
MESAVERDE4929 ft.
WILLIAMS FORK4929 ft.
CAMEO7383 ft.
ROLLINS7814 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 9/7/2016                  Interval Top: 6089 ft.    Interval Bottom: 7668 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:8/30/2016Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/24/2016Treatment End Date:8/28/2016
Treatment Summary:37237 BBLS Slickwater; 703600 mesh/100; (summary)
Total fluid used in treatment (bbls):37237Max pressure during treatment (psi):4612
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.61
Recycled water used in treatment (bbls):37237Total flowback volume recovered (bbls):8253
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):703600Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7509 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:9/7/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1088
CALC_MCF_GAS 1299
CASING_PRESS 1950
MCF_GAS 1299
TUBING_PRESS 1225
Perforation Data:
Interval Top:6089 ft.# Of Holes:168
Interval Bottom:7668 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)70
Total Gas Produced (MCF)38136
GOR544800
GOR DeterminationMCFE
Average BOE per Day18.206
Average MCFE per Day105.594

 Federal Financial Assurance  i Y

 Tribal Well  i No