Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22504
Well Classification: GW Status: PR - 8/1/2020
Well Name/No:WPX GM #542-28
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24099
Facility Status:PRStatus Date8/1/2020
FacilityID:438603LocationID:335318
County:GARFIELD #045Location:NESW 28 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5476 ft.
Basin:PICEANCE BASIN  
Planned Location:1511FSL  2353 FWLLat/Long: 39.492088 / -108.114692Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.492088 / -108.114692Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/22/2015
End Date: 1/26/2015
Reported: 3/16/2015
Days to report: 49
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2020             Measured TD: 7360 ft.    Vertical TD: 6822 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2020
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/15/2016
Proposed Top PZ Location:Sec:28 Twp: 6S 96W Footage: 2555 FNL  1340 FEL
Bottom Hole Location:Sec:28 Twp: 6S 96W Footage: 2555 FNL  1340 FEL
Proposed Depth/Form:7340 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-17 , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1419 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 369, Top: 0 ft., Bottom: 1419 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7340 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 772, Top: , Bottom: 7340 ft.

Wellbore Completed
Completion Date:12/29/2014
Spud Date:12/22/2014Spud Date Is:ACTUAL
Measured TD:7360 ft.Measured PB depth:7315 ft.
True Vertical TD:6822 ft.True Vertical PB depth:6777 ft.
Top PZ Location:Sec:28 Twp: 6S 96WFootage: 2591 FNL  1387 FEL
Bottom Hole Location:Sec:28 Twp: 6S 96WFootage: 2565 FNL  1341 FEL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1437 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 355, Top: 0 ft., Bottom: 1437 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7347 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1085, Top: 3690 ft., Bottom: 7347 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2155 ft.N
MESAVERDE4101 ft.N
CAMEO6740 ft.N
ROLLINS7214 ft.N

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 8/1/2020                  Interval Top: 5090 ft.    Interval Bottom: 7172 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:1/27/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/22/2015Treatment End Date:1/26/2015
Treatment Summary:7 STAGES; 1466500 # 40/70 Sand: 38333 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):38333Max pressure during treatment (psi):6559
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):38333Total flowback volume recovered (bbls):9696
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1466500Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6971 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:2/14/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1086
CALC_MCF_GAS 814
CASING_PRESS 1832
MCF_GAS 814
TUBING_PRESS 1427
Perforation Data:
Interval Top:5090 ft.# Of Holes:163
Interval Bottom:7172 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)77
Total Gas Produced (MCF)38506
GOR500077
GOR DeterminationMCFE
Average BOE per Day18.409
Average MCFE per Day106.763

 Federal Financial Assurance  i Y

 Tribal Well  i No