Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22492
Well Classification: GW Status: PR - 12/31/2014
Well Name/No:WPX GM #513-33
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24099
Facility Status:PRStatus Date12/31/2014
FacilityID:438502LocationID:323902
County:GARFIELD #045Location:NWSW 33 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5743 ft.
Basin:PICEANCE BASIN  
Planned Location:2320FSL  1153 FWLLat/Long: 39.479629 / -108.118519Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.479627 / -108.118520Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 11/28/2014
End Date: 12/19/2014
Reported: 1/27/2015
Days to report: 39
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/31/2014             Measured TD: 6770 ft.    Vertical TD: 6761 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/31/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/9/2016
Proposed Top PZ Location:Sec:33 Twp: 6S 96W Footage: 2518 FSL  1267 FWL
Bottom Hole Location:Sec:33 Twp: 6S 96W Footage: 2518 FSL  1267 FWL
Proposed Depth/Form:6739 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 479-17 , Unit Acreage: 80, Drill Unit: N2SW
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 25, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1003 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 267, Top: 0 ft., Bottom: 1003 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6739 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 756, Top: , Bottom: 6739 ft.

Wellbore Completed
Completion Date:10/15/2014
Spud Date:10/11/2014Spud Date Is:ACTUAL
Measured TD:6770 ft.Measured PB depth:6720 ft.
True Vertical TD:6761 ft.True Vertical PB depth:6711 ft.
Top PZ Location:Sec:33 Twp: 6S 96WFootage: 2497 FSL  1273 FWL
Bottom Hole Location:Sec:33 Twp: 6S 96WFootage: 2490 FSL  1266 FWL
Log Types:SP GR HDIL ZDL RPM CN CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1034 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 300, Top: 0 ft., Bottom: 1034 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6754 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1095, Top: 3280 ft., Bottom: 6754 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 3280 ft., Depth: 5757 ft., Bottom: 5757 ft., Sacks: 650, Method: SQUEEZE
FormationInterval TopLog BottomCoredDSTs
WASATCH G2011 ft.N
MESAVERDE3614 ft.N
CAMEO6125 ft.N
ROLLINS6629 ft.N

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 1/20/2015                 Interval Top: 4860 ft.    Interval Bottom: 6606 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:11/29/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/28/2014Treatment End Date:12/19/2014
Treatment Summary:7 STAGES; 909400 # 40/70 Sand: 24572 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):24572Max pressure during treatment (psi):4286
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.62
Recycled water used in treatment (bbls):24572Total flowback volume recovered (bbls):9317
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):909400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6440 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1063
CALC_MCF_GAS 463
CASING_PRESS 1326
MCF_GAS 463
TUBING_PRESS 1052
Perforation Data:
Interval Top:4860 ft.# Of Holes:149
Interval Bottom:6606 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)38
Total Gas Produced (MCF)25718
GOR676789
GOR DeterminationMCFE
Average BOE per Day12.263
Average MCFE per Day71.094

 Federal Financial Assurance  i Y

 Tribal Well  i No