Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22478
Well Classification: GW Status: PR - 10/1/2016
Well Name/No:TOMPKINS #42A-08-07-95
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2016
FacilityID:438306LocationID:438312
County:GARFIELD #045Location:SESE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5528 ft.
Basin:PICEANCE BASIN  
Planned Location:200FSL  560 FELLat/Long: 39.459961 / -108.013872Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.459962 / -108.013916Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 10/6/2016
End Date: 10/15/2016
Reported: 11/16/2016
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2016             Measured TD: 7150 ft.    Vertical TD: 6826 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/27/2018
Proposed Top PZ Location:Sec:8 Twp: 7S 95W Footage: 1148   633 
Bottom Hole Location:Sec:8 Twp: 7S 95W Footage: 1363   659 
Proposed Depth/Form:7294 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-70 , Unit Acreage: 320, Drill Unit: Sec 8:N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: 111, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1771 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 366, Top: 0 ft., Bottom: 1771 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7294 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 492, Top: 3704 ft., Bottom: 7294 ft.

Wellbore Completed
Completion Date:8/24/2016
Spud Date:8/10/2016Spud Date Is:ACTUAL
Measured TD:7150 ft.Measured PB depth:7087 ft.
True Vertical TD:6826 ft.True Vertical PB depth:6763 ft.
Top PZ Location:Sec:8 Twp: 7S 95WFootage: 1148 FNL  633 FEL
Bottom Hole Location:Sec:8 Twp: 7S 95WFootage: 1363 FNL  659 FEL
Log Types:CBL/MUD/PULSED NEUTRON/Triple Combo in 045-22480
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1769 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 391, Top: 0 ft., Bottom: 1769 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7126 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 789, Top: 3233 ft., Bottom: 7126 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2210 ft.NN
OHIO CREEK3669 ft.NN
WILLIAMS FORK3819 ft.NN
CAMEO6470 ft.NN
ROLLINS6992 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 11/14/2016                Interval Top: 4046 ft.    Interval Bottom: 6979 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/17/2016Choke Size:64.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:10/6/2016Treatment End Date:10/15/2016
Treatment Summary:FRAC'D WITH 181,142 BBLS 2% KCL SLICKWATER AND NO PROPPANT. FRAC PAIR WITH TOMPKINS 32A-08-07-95 (API 05-045-22477)
Total fluid used in treatment (bbls):181142Max pressure during treatment (psi):7322
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):181142Total flowback volume recovered (bbls):69252
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5512 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2016Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1703
BTU_GAS 1013
CALC_BBLS_H2O 1703
CALC_MCF_GAS 2416
CASING_PRESS 500
MCF_GAS 2416
TUBING_PRESS 1375
Perforation Data:
Interval Top:4046 ft.# Of Holes:540
Interval Bottom:6979 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)41
Total Gas Produced (MCF)67858
GOR1655073
GOR DeterminationMCFE
Average BOE per Day32.177
Average MCFE per Day186.629

 Federal Financial Assurance  i 

 Tribal Well  i No