Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22475
Well Classification: GW Status: PR - 10/1/2016
Well Name/No:TOMPKINS #32B-08-07-95
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/1/2016
FacilityID:438303LocationID:438312
County:GARFIELD #045Location:SESE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5528 ft.
Basin:PICEANCE BASIN  
Planned Location:200FSL  585 FELLat/Long: 39.459963 / -108.013960Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.459964 / -108.014004Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/26/2016
End Date: 10/4/2016
Reported: 11/7/2016
Days to report: 34
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/1/2016             Measured TD: 7590 ft.    Vertical TD: 6837 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/1/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/27/2018
Proposed Top PZ Location:Sec:8 Twp: 7S 95W Footage: 1586   1792 
Bottom Hole Location:Sec:8 Twp: 7S 95W Footage: 1817   1970 
Proposed Depth/Form:7562 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-70 , Unit Acreage: 320, Drill Unit: Sec 8:N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: 111, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1808 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 373, Top: 0 ft., Bottom: 1808 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7562 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 507, Top: 3856 ft., Bottom: 7562 ft.

Wellbore Completed
Completion Date:8/31/2016
Spud Date:8/7/2016Spud Date Is:ACTUAL
Measured TD:7590 ft.Measured PB depth:7527 ft.
True Vertical TD:6837 ft.True Vertical PB depth:6774 ft.
Top PZ Location:Sec:8 Twp: 7S 95WFootage: 1586 FNL  1792 FEL
Bottom Hole Location:Sec:8 Twp: 7S 95WFootage: 1817 FNL  1970 FEL
Log Types:CBL/MUD/PULSED NEUTRON/Triple Combo in 045-22480
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1855 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 1855 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7571 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 829, Top: 2825 ft., Bottom: 7571 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2603 ft.NN
OHIO CREEK4062 ft.NN
WILLIAMS FORK4212 ft.NN
CAMEO6897 ft.NN
ROLLINS7388 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/30/2016                Interval Top: 4455 ft.    Interval Bottom: 7380 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/9/2016Choke Size:64.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/26/2016Treatment End Date:10/4/2016
Treatment Summary:Frac'd with 182,105 bbls of 2% KCL slickwater and no proppant. Frac pair with Tompkins 42B-08-07-95 (API 05-045-22473).
Total fluid used in treatment (bbls):182105Max pressure during treatment (psi):7753
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.67
Recycled water used in treatment (bbls):182105Total flowback volume recovered (bbls):49231
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5907 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/30/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1526
BTU_GAS 1006
CALC_BBLS_H2O 1526
CALC_MCF_GAS 2750
CASING_PRESS 575
MCF_GAS 2750
TUBING_PRESS 1350
Perforation Data:
Interval Top:4455 ft.# Of Holes:540
Interval Bottom:7380 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)45
Total Gas Produced (MCF)74379
GOR1652866
GOR DeterminationMCFE
Average BOE per Day35.273
Average MCFE per Day204.578

 Federal Financial Assurance  i 

 Tribal Well  i No