Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22474
Well Classification: GW Status: PR - 3/1/2023
Well Name/No:TOMPKINS #42C-08-07-95
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2023
FacilityID:438302LocationID:438312
County:GARFIELD #045Location:SESE 5 7S95W 6
Field:PARACHUTE - #67350Elevation:5528 ft.
Basin:PICEANCE BASIN  
Planned Location:200FSL  535 FELLat/Long: 39.459960 / -108.013783Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.459960 / -108.013827Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 9/15/2016
End Date: 9/24/2016
Reported: 10/26/2016
Days to report: 32
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2023             Measured TD: 7450 ft.    Vertical TD: 6817 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2023
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/27/2018
Proposed Top PZ Location:Sec:8 Twp: 7S 95W Footage: 1792   623 
Bottom Hole Location:Sec:8 Twp: 7S 95W Footage: 2025   640 
Proposed Depth/Form:7599 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-70 , Unit Acreage: 320, Drill Unit: Sec 8:N/2
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 84 , Citings Type: PLANNED
Cement:Sacks: 111, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1847 ft., Weight: 32 , Citings Type: PLANNED
Cement:Sacks: 381, Top: 0 ft., Bottom: 1847 ft.
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7599 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 495, Top: 3985 ft., Bottom: 7599 ft.

Wellbore Completed
Completion Date:8/17/2016
Spud Date:8/12/2016Spud Date Is:ACTUAL
Measured TD:7450 ft.Measured PB depth:7388 ft.
True Vertical TD:6817 ft.True Vertical PB depth:6755 ft.
Top PZ Location:Sec:8 Twp: 7S 95WFootage: 1792 FNL  623 FEL
Bottom Hole Location:Sec:8 Twp: 7S 95WFootage: 2025 FNL  640 FEL
Log Types:CBL/MUD/PULSED NEUTRON/Triple Combo in 045-22480
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 16 in., Top: 0 ft., Depth: 60 ft., Weight: 75 , Citings Type: ACTUAL
Cement:Sacks: 70, Top: 0 ft., Bottom: 60 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 12.25 in., Size: 8.625 in., Top: 0 ft., Depth: 1854 ft., Weight: 32 , Citings Type: ACTUAL
Cement:Sacks: 406, Top: 0 ft., Bottom: 1854 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 7.875 in., Size: 4.5 in., Top: 0 ft., Depth: 7432 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 812, Top: 1827 ft., Bottom: 7432 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH2500 ft.NN
OHIO CREEK3959 ft.NN
WILLIAMS FORK4109 ft.NN
CAMEO6766 ft.NN
ROLLINS7471 ft.NN

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 3/1/2023                  Interval Top: 4348 ft.    Interval Bottom: 7285 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:9/29/2016Choke Size:64.000 in.
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/15/2016Treatment End Date:9/24/2016
Treatment Summary:Frac'd with 181,145 bbls 2% KCL slickwater and no proppant. Frac pair with Tompkins 32C-08-07-95 (API 05-045-22472).
Total fluid used in treatment (bbls):181145Max pressure during treatment (psi):7730
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.40
Type Of gas:Number Of staged intervals:10
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):181145Total flowback volume recovered (bbls):59127
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:5832 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2016Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1544
BTU_GAS 1013
CALC_BBLS_H2O 1544
CALC_MCF_GAS 2923
CASING_PRESS 550
MCF_GAS 2923
TUBING_PRESS 1400
Perforation Data:
Interval Top:4348 ft.# Of Holes:540
Interval Bottom:7285 ft.Hole Size:0.37 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)41
Total Gas Produced (MCF)63219
GOR1541926
GOR DeterminationMCFE
Average BOE per Day29.978
Average MCFE per Day173.862

 Federal Financial Assurance  i 

 Tribal Well  i No