Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22423
Well Classification: GW Status: PR - 8/4/2020
Well Name/No:Homer Deep Unit #7-23AH
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:LARAMIE ENERGY LLC - 10433
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC067159
Facility Status:PRStatus Date8/4/2020
FacilityID:437387LocationID:436835
County:GARFIELD #045Location:NESW 7 8S98W 6
Field:PICEANCE HORIZONTAL NIOBRARA - #68810Elevation:5676 ft.
Basin:PICEANCE BASIN  
Planned Location:1835FSL  2399 FWLLat/Long: 39.371980 / -108.369820Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.372020 / -108.369706Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/27/2017
End Date: 6/11/2017
Reported: 8/15/2017
Days to report: 65
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/4/2020             Measured TD: 18005 ft.    Vertical TD: 6867 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/4/2020
Wellbore PermitHORIZONTAL
Permit #: Expiration Date:5/29/2016
Proposed Top PZ Location:Sec:18 Twp: 8S 98W Footage: 1009 FNL  1569 FWL
Bottom Hole Location:Sec:20 Twp: 8S 98W Footage: 1903 FSL  841 FWL
Proposed Depth/Form:18375 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEDERAL
Unit:Homer Deep Unit Unit Number:COC72921X
Formation And Spacing:Code: MNCS , Formation: MANCOS , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: line pipe, Citings Type: PLANNED
Cement:Sacks: 320, Top: 0 ft., Bottom: 120 ft.
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1000 ft., Weight: 40.5 , Citings Type: PLANNED
Cement:Sacks: 469, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 7100 ft., Weight: 29.7 , Citings Type: PLANNED
Cement:Sacks: 987, Top: 800 ft., Bottom: 7100 ft.
Casing:String Type: 2ND, Hole Size: 6.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6900 ft., Weight: 17 , Citings Type: PLANNED
Cement:Sacks: , Top: , Bottom:
Casing:String Type: TAPER, Hole Size: 6.75 in., Size: 4.5 in., Top: 6900 ft., Depth: 18360 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 1385, Top: 6900 ft., Bottom: 18360 ft.

Wellbore Completed
Completion Date:6/9/2015
Spud Date:3/30/2015Spud Date Is:ACTUAL
Measured TD:18005 ft.Measured PB depth:17993 ft.
True Vertical TD:6867 ft.True Vertical PB depth:6867 ft.
Top PZ Location:Sec:18 Twp: 8S 98WFootage: 1009 FNL  1569 FWL
Bottom Hole Location:Sec:20 Twp: 8S 98WFootage: 1903 FSL  841 FWL
Log Types:CBL
Log Types:CBL
Casing:String Type: CONDUCTOR, Hole Size: 30 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: 94 , Citings Type: ACTUAL
Cement:Sacks: 320, Top: 0 ft., Bottom: 120 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 14.75 in., Size: 10.75 in., Top: 0 ft., Depth: 1027 ft., Weight: 40.5 , Citings Type: ACTUAL
Cement:Sacks: 450, Top: 0 ft., Bottom: 1027 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 9.875 in., Size: 7.625 in., Top: 0 ft., Depth: 6837 ft., Weight: 29.7 , Citings Type: ACTUAL
Cement:Sacks: 590, Top: 3717 ft., Bottom: 6837 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 6.75 in., Size: 5.5 in., Top: 0 ft., Depth: 6629 ft., Weight: 20 , Citings Type: ACTUAL
Cement:Sacks: , Top: 1504 ft., Bottom: , Determination Method: CBL
Casing:String Type: TAPER, Hole Size: 6.75 in., Size: 4.5 in., Top: 6629 ft., Depth: 17993 ft., Weight: 13.5 , Citings Type: ACTUAL
Cement:Sacks: 1418, Top: , Bottom: 17993 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 237 ft., Depth: 3717 ft., Bottom: 3717 ft., Sacks: 630, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 237 ft., Depth: 3717 ft., Bottom: 3717 ft., Sacks: 630, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
MESAVERDE890 ft.3889 ft.NN
MANCOS3889 ft.NN

Formation NBRR                     Formation Classification:  OG                     Status:  PR - 8/4/2020                  Interval Top: 8335 ft.    Interval Bottom: 17842 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:N/AChoke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/27/2017Treatment End Date:6/11/2017
Treatment Summary:1,166 bbls 15% HCL,
Total fluid used in treatment (bbls):671008Max pressure during treatment (psi):8344
Total gas used in treatment (mcf):Fluid density (lbs/gal):
Type Of gas:Number Of staged intervals:48
Total acid used in treatment (bbls):1166Min frac gradient (psi/ft):
Recycled water used in treatment (bbls):Total flowback volume recovered (bbls):21768
Fresh water used in treatment (bbls):692646Disposition method For flowback:RECYCLE
Total proppant used (lbs):16907920Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7865 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:N/ATest Method:
Hours Tested:Gas Type:
Gas Disposal:
Test TypeMeasure
BBLS_H2O 1566
BTU_GAS 1095
CALC_BBLS_H2O 3795
CALC_MCF_GAS 7900
CASING_PRESS 2800
MCF_GAS 3200
Perforation Data:
Interval Top:8335 ft.# Of Holes:1406
Interval Bottom:17842 ft.Hole Size:0 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)22
Total Gas Produced (MCF)292629
GOR13301318
GOR DeterminationMCFE
Average BOE per Day138.296
Average MCFE per Day802.128

 Federal Financial Assurance  i Y

 Tribal Well  i No