Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22402
Well Classification: GW Status: PR - 10/20/2014
Well Name/No:ISLAND RANCH #21C-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/20/2014
FacilityID:437047LocationID:436810
County:GARFIELD #045Location:Lot 11 13 7S96W 6
Field:PARACHUTE - #67350Elevation:5056 ft.
Basin:PICEANCE BASIN  
Planned Location:1294FSL  1062 FWLLat/Long: 39.433758 / -108.064231Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.433758 / -108.064231Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/20/2014             Measured TD: 6570 ft.    Vertical TD: 5767 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/20/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/2/2016
Proposed Top PZ Location:Sec:24 Twp: 7S 96W Footage: 832 FNL  1980 FWL
Bottom Hole Location:Sec:24 Twp: 7S 96W Footage: 832 FNL  1980 FWL
Proposed Depth/Form:6480 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 510-64 , Unit Acreage: 76, Drill Unit: L2-L4
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 75 ft., Weight: 84# , Citings Type: PLANNED
Cement:Sacks: 115, Top: 0 ft., Bottom: 75 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6480 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 950, Top: , Bottom: 6480 ft.

Wellbore Completed
Completion Date:6/25/2014
Spud Date:6/22/2014Spud Date Is:ACTUAL
Measured TD:6570 ft.Measured PB depth:6518 ft.
True Vertical TD:5767 ft.True Vertical PB depth:5715 ft.
Top PZ Location:Sec:24 Twp: 7S 96WFootage: 774 FNL  2032 FWL
Bottom Hole Location:Sec:24 Twp: 7S 96WFootage: 835 FNL  2041 FWL
Log Types:Mud, Triple Combo, and CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 94 ft., Weight: 94 , Citings Type: ACTUAL
Cement:Sacks: 100, Top: 0 ft., Bottom: 94 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 926 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 926 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6557 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 2044 ft., Bottom: 6557 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3594 ft.
CAMEO5895 ft.
ROLLINS6329 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/20/2014                Interval Top: 4637 ft.    Interval Bottom: 6281 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/5/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/29/2014Treatment End Date:10/3/2014
Treatment Summary:WFCM - Frac'd with 55,796 bbls slickwater and 1,008 bbls 7.5% HCL Acid.
Total fluid used in treatment (bbls):56804Max pressure during treatment (psi):5993
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.44
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):1008Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):55796Total flowback volume recovered (bbls):3613
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6078 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/20/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 174
BTU_GAS 1080
CALC_BBLS_H2O 174
CALC_MCF_GAS 1981
CASING_PRESS 1400
MCF_GAS 1981
TUBING_PRESS 1050
Perforation Data:
Interval Top:4637 ft.# Of Holes:189
Interval Bottom:6281 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)64
Total Gas Produced (MCF)58922
GOR920656
GOR DeterminationMCFE
Average BOE per Day28.003
Average MCFE per Day162.434

 Federal Financial Assurance  i 

 Tribal Well  i No