|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 9/1/2014 Measured TD: 6050 ft. Vertical TD: 5883 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 9/1/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 5/2/2016 | | Proposed Top PZ Location: | Sec:13 Twp: 7S 96W | Footage: 1855 FSL 1980 FWL | | Bottom Hole Location: | Sec:13 Twp: 7S 96W | Footage: 1855 FSL 1980 FWL | | Proposed Depth/Form: | 5988 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 479-21 , Unit Acreage: 160, Drill Unit: SW/4 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 75 ft., Weight: 84# , Citings Type: PLANNED | | Cement: | Sacks: 115, Top: 0 ft., Bottom: 75 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36# , Citings Type: PLANNED | | Cement: | Sacks: 290, Top: 0 ft., Bottom: 1000 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 5988 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 950, Top: , Bottom: 5988 ft. |
| | |
| Wellbore Completed | | Completion Date: | 5/28/2014 | | Spud Date: | 5/26/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 6050 ft. | Measured PB depth: | 6026 ft. | | True Vertical TD: | 5883 ft. | True Vertical PB depth: | 5859 ft. | | Top PZ Location: | Sec:13 Twp: 7S 96W | Footage: 1864 FSL 1949 FWL | | Bottom Hole Location: | Sec:13 Twp: 7S 96W | Footage: 1881 FSL 1973 FWL | | Log Types: | Mud, Triple Combo, and CBL | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 107 , Citings Type: ACTUAL | | Cement: | Sacks: 100, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1010 ft., Weight: 36 , Citings Type: ACTUAL | | Cement: | Sacks: 265, Top: 0 ft., Bottom: 1010 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6047 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 970, Top: 1025 ft., Bottom: 6047 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WILLIAMS FORK | 3114 ft. | | | | | CAMEO | 5359 ft. | | | | | ROLLINS | 5822 ft. | | | |
Formation WFCM Formation Classification: GW Status: PR - 9/24/2014 Interval Top: 4057 ft. Interval Bottom: 5776 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 9/24/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 9/18/2014 | Treatment End Date: | 9/21/2014 | | Treatment Summary: | WFCM - Frac'd with 55,976 bbls slickwater and 1,008 bbls 7.5% HCL Acid. | | Total fluid used in treatment (bbls): | 56984 | Max pressure during treatment (psi): | 6094 | | Total gas used in treatment (mcf): | 0 | Fluid density (lbs/gal): | 8.44 | | Type Of gas: | | Number Of staged intervals: | 7 | | Total acid used in treatment (bbls): | 1008 | Min frac gradient (psi/ft): | 0.74 | | Recycled water used in treatment (bbls): | 55976 | Total flowback volume recovered (bbls): | 5373 | | Fresh water used in treatment (bbls): | 0 | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 0 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5514 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/24/2014 | Test Method: | Flowing | | Hours Tested: | 24 | Gas Type: | WET | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BBLS_H2O | 3273 | | BTU_GAS | 1080 | | CALC_BBLS_H2O | 3273 | | CALC_MCF_GAS | 854 | | CASING_PRESS | 1050 | | MCF_GAS | 854 |
| | Perforation Data: | | Interval Top: | 4057 ft. | # Of Holes: | 189 | | Interval Bottom: | 5776 ft. | Hole Size: | 0.34 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 30 |
| Total Gas Produced (MCF) | 30933 |
| GOR | 1031100 |
| GOR Determination | MCFE |
| Average BOE per Day | 14.683 |
| Average MCFE per Day | 85.164 |
| Federal Financial Assurance | i | |
|
|