Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22395
Well Classification: GW Status: PR - 10/2/2014
Well Name/No:ISLAND RANCH #21D-24
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:QB ENERGY OPERATING LLC - 10844
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date10/2/2014
FacilityID:437040LocationID:436810
County:GARFIELD #045Location:Lot 11 13 7S96W 6
Field:PARACHUTE - #67350Elevation:5056 ft.
Basin:PICEANCE BASIN  
Planned Location:1287FSL  1063 FWLLat/Long: 39.433736 / -108.064225Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.433736 / -108.064228Lat/Long Source: Field Measured
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 10/2/2014             Measured TD: 6668 ft.    Vertical TD: 5708 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 10/2/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/2/2016
Proposed Top PZ Location:Sec:24 Twp: 7S 96W Footage: 1100 FNL  1980 FWL
Bottom Hole Location:Sec:24 Twp: 7S 96W Footage: 1100 FNL  1980 FWL
Proposed Depth/Form:6582 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 510-64 , Unit Acreage: 76, Drill Unit: L2-L4
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 16 in., Top: 0 ft., Depth: 75 ft., Weight: 84# , Citings Type: PLANNED
Cement:Sacks: 115, Top: 0 ft., Bottom: 75 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1000 ft., Weight: 36# , Citings Type: PLANNED
Cement:Sacks: 290, Top: 0 ft., Bottom: 1000 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6582 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 950, Top: , Bottom: 6582 ft.

Wellbore Completed
Completion Date:7/3/2014
Spud Date:6/30/2014Spud Date Is:ACTUAL
Measured TD:6668 ft.Measured PB depth:6619 ft.
True Vertical TD:5708 ft.True Vertical PB depth:5659 ft.
Top PZ Location:Sec:24 Twp: 7S 96WFootage: 1097 FNL  2087 FWL
Bottom Hole Location:Sec:24 Twp: 7S 96WFootage: 1099 FNL  2078 FWL
Log Types:Mud, Triple Combo, and CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 84 ft., Weight: 107 , Citings Type: ACTUAL
Cement:Sacks: 150, Top: 0 ft., Bottom: 84 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1010 ft., Weight: 36 , Citings Type: ACTUAL
Cement:Sacks: 265, Top: 0 ft., Bottom: 1010 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.5 in., Size: 4.5 in., Top: 0 ft., Depth: 6664 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1095, Top: 1630 ft., Bottom: 6664 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WILLIAMS FORK3720 ft.
CAMEO6019 ft.
ROLLINS6463 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 10/2/2014                 Interval Top: 4743 ft.    Interval Bottom: 6410 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:10/2/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/26/2014Treatment End Date:9/29/2014
Treatment Summary:WFCM - Frac'd with 55,976 bbls slickwater and 1,008 bbls 7.5% HCL Acid.
Total fluid used in treatment (bbls):56984Max pressure during treatment (psi):5995
Total gas used in treatment (mcf):0Fluid density (lbs/gal):8.44
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):1008Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):55976Total flowback volume recovered (bbls):2924
Fresh water used in treatment (bbls):0Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6217 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:10/2/2014Test Method:Flowing
Hours Tested:24Gas Type:WET
Gas Disposal:SOLD
Test TypeMeasure
BBLS_H2O 1084
BTU_GAS 1080
CALC_BBLS_H2O 1084
CALC_MCF_GAS 836
CASING_PRESS 900
MCF_GAS 836
Perforation Data:
Interval Top:4743 ft.# Of Holes:189
Interval Bottom:6410 ft.Hole Size:0.34 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)41
Total Gas Produced (MCF)39806
GOR970878
GOR DeterminationMCFE
Average BOE per Day18.906
Average MCFE per Day109.673

 Federal Financial Assurance  i 

 Tribal Well  i No