|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 10/1/2014 Measured TD: 6080 ft. Vertical TD: 5960 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 10/1/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 12/14/2015 | | Proposed Top PZ Location: | Sec:13 Twp: 7S 96W | Footage: 603 FNL 794 FWL | | Bottom Hole Location: | Sec:13 Twp: 7S 96W | Footage: 603 FNL 794 FWL | | Proposed Depth/Form: | 6087 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEE | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 479-21 , Unit Acreage: 160, Drill Unit: NW/4 | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 50, Top: 0 ft., Bottom: 60 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1127 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 297, Top: 0 ft., Bottom: 1127 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6087 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 741, Top: 0 ft., Bottom: 6087 ft. |
| | |
| Wellbore Completed | | Completion Date: | 6/30/2014 | | Spud Date: | 6/25/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 6080 ft. | Measured PB depth: | 6036 ft. | | True Vertical TD: | 5960 ft. | True Vertical PB depth: | 5916 ft. | | Top PZ Location: | Sec:13 Twp: 7S 96W | Footage: 577 FNL 823 FWL | | Bottom Hole Location: | Sec:13 Twp: 7S 96W | Footage: 581 FNL 814 FWL | | Log Types: | RPM CBL MUDLOGS | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 64 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 24, Top: 0 ft., Bottom: 64 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1306 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 330, Top: 0 ft., Bottom: 1306 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6066 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1024, Top: 2190 ft., Bottom: 6066 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 1120 ft. | | N | | | MESAVERDE | 3002 ft. | | N | | | CAMEO | 5510 ft. | | N | | | ROLLINS | 5956 ft. | | N | |
Formation WFCM Formation Classification: GW Status: PR - 10/1/2014 Interval Top: 4178 ft. Interval Bottom: 5900 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 8/8/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 8/7/2014 | Treatment End Date: | 8/8/2014 | | Treatment Summary: | 5 STAGES; 662000# 40/70 Sand: 18215Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 18215 | Max pressure during treatment (psi): | 5652 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 5 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.69 | | Recycled water used in treatment (bbls): | 18215 | Total flowback volume recovered (bbls): | 4709 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 662000 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5729 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | 9/23/2014 | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1087 | | CALC_MCF_GAS | 871 | | CASING_PRESS | 1254 | | MCF_GAS | 871 | | TUBING_PRESS | 1037 |
| | Perforation Data: | | Interval Top: | 4178 ft. | # Of Holes: | 111 | | Interval Bottom: | 5900 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 29 |
| Total Gas Produced (MCF) | 19220 |
| GOR | 662758 |
| GOR Determination | MCFE |
| Average BOE per Day | 9.158 |
| Average MCFE per Day | 53.117 |
| Federal Financial Assurance | i | |
|
|