Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22264
Well Classification: GW Status: PR - 1/1/2018
Well Name/No:C&C Energy #GM 422-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date1/1/2018
FacilityID:435449LocationID:334722
Municipality/County:PARACHUTE / GARFIELD #045Location:SWSW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5141 ft.
Basin:PICEANCE BASIN  
Planned Location:266FSL  1029 FWLLat/Long: 39.445597 / -108.064494Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.445596 / -108.064494Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/16/2014
End Date: 6/19/2014
Reported: 8/5/2014
Days to report: 47
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 1/1/2018             Measured TD: 6852 ft.    Vertical TD: 5949 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 1/1/2018
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/14/2015
Proposed Top PZ Location:Sec:13 Twp: 7S 96W Footage: 2040 FNL  2160 FWL
Bottom Hole Location:Sec:13 Twp: 7S 96W Footage: 2040 FNL  2160 FWL
Proposed Depth/Form:6827 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 479-21 , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1515 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 393, Top: 0 ft., Bottom: 1515 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6827 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 760, Top: , Bottom: 6827 ft.

Wellbore Completed
Completion Date:5/3/2014
Spud Date:4/27/2014Spud Date Is:ACTUAL
Measured TD:6852 ft.Measured PB depth:6809 ft.
True Vertical TD:5949 ft.True Vertical PB depth:5906 ft.
Top PZ Location:Sec:13 Twp: 7S 96WFootage: 2003 FNL  2195 FWL
Bottom Hole Location:Sec:13 Twp: 7S 96WFootage: 2052 FNL  2152 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 67 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 37, Top: 0 ft., Bottom: 67 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1356 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 395, Top: 0 ft., Bottom: 1356 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6840 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1020, Top: 2528 ft., Bottom: 6840 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1158 ft.
MESAVERDE3682 ft.
CAMEO6234 ft.
ROLLINS6735 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 1/1/2018                  Interval Top: 5127 ft.    Interval Bottom: 6672 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/20/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/16/2014Treatment End Date:6/19/2014
Treatment Summary:6 STAGES; 768200 # 40/70 Sand: 21231 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):21231Max pressure during treatment (psi):5085
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):21231Total flowback volume recovered (bbls):8360
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):768200Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6529 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/1/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1036
CALC_MCF_GAS 1237
CASING_PRESS 1749
MCF_GAS 1237
TUBING_PRESS 1397
Perforation Data:
Interval Top:5127 ft.# Of Holes:127
Interval Bottom:6672 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)29
Total Gas Produced (MCF)18993
GOR654931
GOR DeterminationMCFE
Average BOE per Day9.050
Average MCFE per Day52.503

 Federal Financial Assurance  i 

 Tribal Well  i No