Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22259
Well Classification: GW Status: PR - 12/1/2017
Well Name/No:C&C Energy #GM 22-13
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date12/1/2017
FacilityID:435444LocationID:334722
Municipality/County:PARACHUTE / GARFIELD #045Location:SWSW 12 7S96W 6
Field:GRAND VALLEY - #31290Elevation:5141 ft.
Basin:PICEANCE BASIN  
Planned Location:271FSL  1015 FWLLat/Long: 39.445611 / -108.064544Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.445610 / -108.064544Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 6/27/2014
End Date: 6/28/2014
Reported: 8/5/2014
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 12/1/2017             Measured TD: 6535 ft.    Vertical TD: 5984 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 12/1/2017
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:12/14/2015
Proposed Top PZ Location:Sec:13 Twp: 7S 96W Footage: 1339 FNL  2164 FWL
Bottom Hole Location:Sec:13 Twp: 7S 96W Footage: 1339 FNL  2164 FWL
Proposed Depth/Form:6530 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WFILS , Formation: WILLIAMS FORK-ILES , Order: 479-21 , Unit Acreage: 160, Drill Unit: NW/4
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1661 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 429, Top: 0 ft., Bottom: 1661 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6530 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 750, Top: , Bottom: 6530 ft.

Wellbore Completed
Completion Date:5/17/2014
Spud Date:5/11/2014Spud Date Is:ACTUAL
Measured TD:6535 ft.Measured PB depth:6494 ft.
True Vertical TD:5984 ft.True Vertical PB depth:5943 ft.
Top PZ Location:Sec:13 Twp: 7S 96WFootage: 1304 FNL  2189 FWL
Bottom Hole Location:Sec:13 Twp: 7S 96WFootage: 1327 FNL  2174 FWL
Log Types:RPM CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 44 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 44 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1678 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 400, Top: 0 ft., Bottom: 1678 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6503 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 990, Top: 2360 ft., Bottom: 6503 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1138 ft.
MESAVERDE3389 ft.
CAMEO5925 ft.
ROLLINS6405 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 12/1/2017                 Interval Top: 4803 ft.    Interval Bottom: 6324 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:6/28/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:6/27/2014Treatment End Date:6/28/2014
Treatment Summary:5 STAGES; 590400 # 40/70 Sand: 16498 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):16498Max pressure during treatment (psi):5934
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:5
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.70
Recycled water used in treatment (bbls):16498Total flowback volume recovered (bbls):4984
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):590400Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6180 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:7/9/2014Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1092
CALC_MCF_GAS 1096
CASING_PRESS 1776
MCF_GAS 1096
TUBING_PRESS 1451
Perforation Data:
Interval Top:4803 ft.# Of Holes:105
Interval Bottom:6324 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)27
Total Gas Produced (MCF)19697
GOR729518
GOR DeterminationMCFE
Average BOE per Day9.379
Average MCFE per Day54.401

 Federal Financial Assurance  i 

 Tribal Well  i No