Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22226
Well Classification: GW Status: PR - 5/31/2014
Well Name/No:PA #311-7
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date5/31/2014
FacilityID:435139LocationID:335035
County:GARFIELD #045Location:LOT 10 6 7S95W 6
Field:PARACHUTE - #67350Elevation:5152 ft.
Basin:PICEANCE BASIN  
Planned Location:741FSL  755 FWLLat/Long: 39.461802 / -108.046584Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.461801 / -108.046583Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/16/2014
End Date: 5/16/2014
Reported: 7/1/2014
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 5/31/2014             Measured TD: 6585 ft.    Vertical TD: 6482 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 5/31/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:11/22/2015
Proposed Top PZ Location:Sec:7 Twp: 7S 95W Footage: 123 FNL  620 FWL
Bottom Hole Location:Sec:7 Twp: 7S 95W Footage: 129 FNL  608 FWL
Proposed Depth/Form:6560 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-61 , Unit Acreage: 320, Drill Unit: N/2

Wellbore Completed
Completion Date:4/4/2014
Spud Date:3/29/2014Spud Date Is:ACTUAL
Measured TD:6585 ft.Measured PB depth:6546 ft.
True Vertical TD:6482 ft.True Vertical PB depth:6443 ft.
Top PZ Location:Sec:7 Twp: 7S 95WFootage: 123 FNL  620 FWL
Bottom Hole Location:Sec:7 Twp: 7S 95WFootage: 129 FNL  608 FWL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1035 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 280, Top: 0 ft., Bottom: 1035 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 6579 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1250, Top: 1405 ft., Bottom: 6579 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1469 ft.
MESAVERDE3397 ft.
CAMEO5843 ft.
ROLLINS6405 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 5/31/2014                 Interval Top: 5229 ft.    Interval Bottom: 6333 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/17/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/16/2014Treatment End Date:5/16/2014
Treatment Summary:542900# 40/70 Sand; 15287 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):15287Max pressure during treatment (psi):3258
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:4
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.76
Recycled water used in treatment (bbls):15287Total flowback volume recovered (bbls):4501
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):542900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:6228 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1024
CALC_MCF_GAS 555
CASING_PRESS 1507
MCF_GAS 555
TUBING_PRESS 1143
Perforation Data:
Interval Top:5229 ft.# Of Holes:86
Interval Bottom:6333 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
October 2024 - September 2025i
Total Oil Produced (Barrels)16
Total Gas Produced (MCF)9103
GOR568937
GOR DeterminationMCFE
Average BOE per Day4.346
Average MCFE per Day25.204

 Federal Financial Assurance  i 

 Tribal Well  i No