Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22187
Well Classification: GW Status: PR - 8/1/2015
Well Name/No:Puckett #GM 314-21
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:COC24099
Facility Status:PRStatus Date8/1/2015
FacilityID:434815LocationID:433948
County:GARFIELD #045Location:Lot 4 28 6S96W 6
Field:GRAND VALLEY - #31290Elevation:5604 ft.
Basin:PICEANCE BASIN  
Planned Location:1297FNL  1042 FWLLat/Long: 39.498914 / -108.119464Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.498914 / -108.119464Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 4/7/2015
End Date: 4/14/2015
Reported: 5/26/2015
Days to report: 42
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 8/1/2015             Measured TD: 7444 ft.    Vertical TD: 6968 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 8/1/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:10/21/2015
Proposed Top PZ Location:Sec:21 Twp: 6S 96W Footage: 728 FSL  1337 FWL
Bottom Hole Location:Sec:21 Twp: 6S 96W Footage: 728 FSL  1337 FWL
Proposed Depth/Form:7420 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEDERALSurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 510-13 , Unit Acreage: , Drill Unit: ALL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1584 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 410, Top: 0 ft., Bottom: 1584 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7441 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 771, Top: 4036 ft., Bottom: 7441 ft.

Wellbore Completed
Completion Date:12/3/2014
Spud Date:11/24/2014Spud Date Is:ACTUAL
Measured TD:7444 ft.Measured PB depth:7397 ft.
True Vertical TD:6968 ft.True Vertical PB depth:6921 ft.
Top PZ Location:Sec:21 Twp: 6S 96WFootage: 671 FSL  1336 FWL
Bottom Hole Location:Sec:21 Twp: 6S 96WFootage: 739 FSL  1347 FWL
Log Types:RPM/MUD/CBL/Triple Combination
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1614 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 405, Top: 0 ft., Bottom: 1614 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7425 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1240, Top: 4372 ft., Bottom: 7425 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2252 ft.
MESAVERDE4270 ft.
WILLIAMS FORK4270 ft.
CAMEO6863 ft.
ROLLINS7339 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 5/31/2015                 Interval Top: 5180 ft.    Interval Bottom: 7314 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:4/22/2015Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:4/7/2015Treatment End Date:4/14/2015
Treatment Summary:0 Gals 7 ½% HCL; 27970 Bbls Slickwater; 1023100 # 40/70 Sand (Summary)
Total fluid used in treatment (bbls):27970Max pressure during treatment (psi):4322
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.66
Recycled water used in treatment (bbls):27970Total flowback volume recovered (bbls):11689
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1023100Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7064 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:5/31/2015Test Method:FLOWING
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1069
CALC_BBLS_OIL 1063
CALC_MCF_GAS 655
CASING_PRESS 1097
MCF_GAS 655
TUBING_PRESS 743
Perforation Data:
Interval Top:5180 ft.# Of Holes:156
Interval Bottom:7314 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
December 2024 - November 2025i
Total Oil Produced (Barrels)35
Total Gas Produced (MCF)18271
GOR522028
GOR DeterminationMCFE
Average BOE per Day8.737
Average MCFE per Day50.663

 Federal Financial Assurance  i Y

 Tribal Well  i No