Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22157
Well Classification: GW Status: PR - 7/1/2016
Well Name/No:Langstaff #RWF 724-16
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date7/1/2016
FacilityID:434347LocationID:335188
County:GARFIELD #045Location:Lot 11 16 6S94W 6
Field:RULISON - #75400Elevation:5582 ft.
Basin:PICEANCE BASIN  
Planned Location:1722FSL  1578 FWLLat/Long: 39.522863 / -107.897350Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.522863 / -107.897350Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 1/13/2014
End Date: 2/13/2014
Reported: 3/18/2014
Days to report: 33
Disclosure: Sidetrack #00
Start Date: 7/31/2014
End Date: 7/31/2014
Reported: 9/29/2014
Days to report: 60
Disclosure: Sidetrack #00
Start Date: 11/6/2014
End Date: 11/6/2014
Reported: 1/5/2015
Days to report: 60
Disclosure: Sidetrack #00
Start Date: 12/16/2014
End Date: 12/16/2014
Reported: 2/11/2015
Days to report: 57
Disclosure: Sidetrack #00
Start Date: 9/24/2015
End Date: 9/24/2015
Reported: 11/17/2015
Days to report: 54
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 7/1/2016             Measured TD: 13797 ft.    Vertical TD: 13764 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 7/1/2016
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:5/5/2018
Proposed Top PZ Location:Sec:16 Twp: 6S 94W Footage: 987 FSL  1707 FWL
Bottom Hole Location:Sec:16 Twp: 6S 94W Footage: 953 FSL  1702 FWL
Proposed Depth/Form:13763 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: MNCS , Formation: MANCOS , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: NBRR , Formation: NIOBRARA , Order: , Unit Acreage: , Drill Unit:
Formation And Spacing:Code: SEGO , Formation: SEGO , Order: , Unit Acreage: , Drill Unit:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 120 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 51, Top: 0 ft., Bottom: 120 ft.
Casing:String Type: SURF, Hole Size: 18 in., Size: 13.375 in., Top: 0 ft., Depth: 1432 ft., Weight: 68 , Citings Type: PLANNED
Cement:Sacks: 580, Top: 0 ft., Bottom: 1432 ft.
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 8952 ft., Weight: 53.5 , Citings Type: PLANNED
Cement:Sacks: 1320, Top: 6338 ft., Bottom: 8952 ft.
Casing:String Type: S.C. 1.1, Hole Size: , Size: , Top: , Depth: 5000 ft., Weight: , Citings Type: PLANNED
Cement:Sacks: 1212, Top: 1686 ft., Bottom: 5000 ft.
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13763 ft., Weight: 23 , Citings Type: PLANNED
Cement:Sacks: 1070, Top: 8060 ft., Bottom: 13763 ft.

Wellbore Completed
Completion Date:12/17/2013
Spud Date:11/5/2013Spud Date Is:ACTUAL
Measured TD:13797 ft.Measured PB depth:13714 ft.
True Vertical TD:13764 ft.True Vertical PB depth:13681 ft.
Top PZ Location:Sec:16 Twp: 6S 94WFootage: 987 FSL  1707 FWL
Bottom Hole Location:Sec:16 Twp: 6S 94WFootage: 953 FSL  1702 FWL
Log Types:SP GR HDIL ZDL CN CBL MUDLOGS
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 20 in., Top: 0 ft., Depth: 137 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 51, Top: 0 ft., Bottom: 137 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 18 in., Size: 13.375 in., Top: 0 ft., Depth: 1432 ft., Weight: 68 , Citings Type: ACTUAL
Cement:Sacks: 580, Top: 0 ft., Bottom: 1432 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 12.25 in., Size: 9.625 in., Top: 0 ft., Depth: 8952 ft., Weight: 53.5 , Citings Type: ACTUAL
Cement:Sacks: 1320, Top: 6338 ft., Bottom: 8952 ft., Determination Method: CBL
Casing:String Type: 2ND, Hole Size: 7.875 in., Size: 5.5 in., Top: 0 ft., Depth: 13763 ft., Weight: 23 , Citings Type: ACTUAL
Cement:Sacks: 1070, Top: 8060 ft., Bottom: 13763 ft., Determination Method: CBL
Additional Cement:String Type: 1ST , Top: 1686 ft., Depth: 5000 ft., Bottom: 5000 ft., Sacks: 1212, Method: DV TOOL
Additional Cement:String Type: 1ST , Top: 1686 ft., Depth: 5000 ft., Bottom: 5000 ft., Sacks: 1212, Method: DV TOOL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1958 ft.N
MESAVERDE4465 ft.N
CAMEO7298 ft.N
ROLLINS8187 ft.N
COZZETTE8534 ft.N
CORCORAN8889 ft.N
SEGO8974 ft.N
CASTLEGATE10950 ft.
MANCOS11305 ft.N
NIOBRARA12481 ft.N

Formation NBRR                     Formation Classification:  OG                     Status:  AB - 2/2/2016                  Interval Top: 12526 ft.    Interval Bottom: 12661 ft.

 Completed Information for Formation NIOBRARA
1st Production Date:1/16/2014Choke Size: 
Formation Name:NIOBRARACommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/31/2014Treatment End Date:7/31/2014
Treatment Summary:3877 Gals 10% HCL; 13239 BBLs Slickwater; 176990 #40/70 Sand; 95010 100/Mesh; (summary)
Total fluid used in treatment (bbls):13331Max pressure during treatment (psi):10839
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):92Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):13239Total flowback volume recovered (bbls):1854
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):272000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:2/13/2014Treatment End Date:2/13/2014
Treatment Summary:3990 Gals 10% HCL; 13651 BBLs Slickwater; 86382 Mesh/100; 242605 40/70 Sand; (summary)
Total fluid used in treatment (bbls):13746Max pressure during treatment (psi):9183
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):13651Total flowback volume recovered (bbls):1854
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):328987Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:1/13/2014Treatment End Date:1/13/2014
Treatment Summary:6015 Gals 10% HCL; 12752 BBLs Slickwater; 72818 100/Mesh; 202082 40/70 Sand; (Summary)
Total fluid used in treatment (bbls):12895Max pressure during treatment (psi):10487
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):143Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):12752Total flowback volume recovered (bbls):1854
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):274900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:13321 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/31/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 996
CALC_MCF_GAS 240
CASING_PRESS 1260
MCF_GAS 240
TUBING_PRESS 867
Perforation Data:
Interval Top:12526 ft.# Of Holes:30
Interval Bottom:12661 ft.Hole Size:0.35 in.

Formation MNCS                     Formation Classification:  OG                     Status:  SI - 7/1/2025                  Interval Top: 11737 ft.    Interval Bottom: 11957 ft.

 Completed Information for Formation MANCOS
1st Production Date:11/6/2014Choke Size: 
Formation Name:MANCOSCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/16/2014Treatment End Date:12/16/2014
Treatment Summary:4000 Gals 15% HCL; 11641 BBLs Slickwater; 199082 #40/70 Sand: 89818 100/Mesh; (summary) This is a subsequent completion of the Mancos formation.
Total fluid used in treatment (bbls):11736Max pressure during treatment (psi):8844
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):11641Total flowback volume recovered (bbls):2011
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):288900Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:11/6/2014Treatment End Date:11/6/2014
Treatment Summary:4000 Gals 10% HCL; 12007 BBLs Slickwater; 90260 Mesh/100; 198300 40/70 Sand; (summary)
Total fluid used in treatment (bbls):12102Max pressure during treatment (psi):10990
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):95Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):12007Total flowback volume recovered (bbls):2001
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):288560Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:13321 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/17/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 977
CALC_MCF_GAS 739
CASING_PRESS 2710
MCF_GAS 739
TUBING_PRESS 2221
Perforation Data:
Interval Top:11737 ft.# Of Holes:24
Interval Bottom:11957 ft.Hole Size:0.35 in.

Formation CSLGT                   Formation Classification:  OG                   Status:  AB - 9/15/2015                 Interval Top: 10950 ft.    Interval Bottom: 10950 ft.

 Completed Information for Formation CASTLEGATE
1st Production Date:N/AChoke Size: 
Formation Name:CASTLEGATECommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:8/21/2015Treatment End Date:8/21/2015
Treatment Summary:111 BBLS Slickwater; (summary) This formation was a DFIT formation. This formation never produced.
Total fluid used in treatment (bbls):111Max pressure during treatment (psi):13951
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):111Total flowback volume recovered (bbls):5521
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):0Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
No Initial Test Data was found for formation CSLGT.
Perforation Data:
Interval Top:10950 ft.# Of Holes:6
Interval Bottom:10950 ft.Hole Size:0.35 in.

Formation SEGO                     Formation Classification:  OG                     Status:  PR - 7/1/2016                  Interval Top: 9000 ft.    Interval Bottom: 9300 ft.

 Completed Information for Formation SEGO
1st Production Date:9/24/2015Choke Size: 
Formation Name:SEGOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:9/24/2015Treatment End Date:9/24/2015
Treatment Summary:1000 Gals 15% HCL; 10603 BBLS Slickwater; 310327 100/Mesh; 75265 #40/70 Sand;
Total fluid used in treatment (bbls):10627Max pressure during treatment (psi):4973
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:1
Total acid used in treatment (bbls):24Min frac gradient (psi/ft):1.03
Recycled water used in treatment (bbls):10603Total flowback volume recovered (bbls):3244
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):385592Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:Tubing Setting Depth:
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:11/14/2015Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 996
CALC_MCF_GAS 100
CASING_PRESS 2395
MCF_GAS 100
TUBING_PRESS 734
Perforation Data:
Interval Top:9000 ft.# Of Holes:20
Interval Bottom:9300 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)7
Total Gas Produced (MCF)5072
GOR724571
GOR DeterminationMCFE
Average BOE per Day2.406
Average MCFE per Day13.981

 Federal Financial Assurance  i 

 Tribal Well  i No