Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22151
Well Classification: GW Status: PR - 6/7/2014
Well Name/No:WPX ENERGY #PA 444-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/7/2014
FacilityID:433913LocationID:323841
County:GARFIELD #045Location:NESW 2 7S95W 6
Field:PARACHUTE - #67350Elevation:5820 ft.
Basin:PICEANCE BASIN  
Planned Location:2029FSL  1548 FWLLat/Long: 39.465053 / -107.969322Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465053 / -107.969323Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/22/2014
End Date: 5/28/2014
Reported: 7/2/2014
Days to report: 35
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/7/2014             Measured TD: 8105 ft.    Vertical TD: 7346 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/7/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/14/2015
Proposed Top PZ Location:Sec:3 Twp: 7S 95W Footage: 618 FSL  595 FEL
Bottom Hole Location:Sec:3 Twp: 7S 95W Footage: 618 FSL  595 FEL
Proposed Depth/Form:8099 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-46 , Unit Acreage: 320, Drill Unit: Sec 3: S/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1281 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 335, Top: 0 ft., Bottom: 1281 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8099 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 851, Top: 4518 ft., Bottom: 8099 ft.

Wellbore Completed
Completion Date:5/12/2014
Spud Date:5/5/2014Spud Date Is:ACTUAL
Measured TD:8105 ft.Measured PB depth:8029 ft.
True Vertical TD:7346 ft.True Vertical PB depth:7270 ft.
Top PZ Location:Sec:3 Twp: 7S 95WFootage: 607 FSL  567 FEL
Bottom Hole Location:Sec:3 Twp: 7S 95WFootage: 572 FSL  600 FEL
Log Types:RPM/CBL/MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 65 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 65 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1303 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 330, Top: 0 ft., Bottom: 1303 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8085 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1475, Top: 3036 ft., Bottom: 8085 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1877 ft.
MESAVERDE4636 ft.
CAMEO7014 ft.
ROLLINS7954 ft.

Formation WFCM                     Formation Classification:  GW                     Status:  PR - 6/7/2014                  Interval Top: 5871 ft.    Interval Bottom: 7886 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/25/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/22/2014Treatment End Date:5/28/2014
Treatment Summary:No Acid; 30371 Bbls Slickwater; 1108300 # 40/70 Sand (Summary)
Total fluid used in treatment (bbls):30371Max pressure during treatment (psi):6158
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):0Min frac gradient (psi/ft):0.75
Recycled water used in treatment (bbls):30371Total flowback volume recovered (bbls):10508
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1108300Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7682 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/7/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1089
CALC_MCF_GAS 1189
CASING_PRESS 1848
MCF_GAS 1189
TUBING_PRESS 1408
Perforation Data:
Interval Top:5871 ft.# Of Holes:146
Interval Bottom:7886 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)101
Total Gas Produced (MCF)65387
GOR647396
GOR DeterminationMCFE
Average BOE per Day31.189
Average MCFE per Day180.856

 Federal Financial Assurance  i 

 Tribal Well  i No