Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22149
Well Classification: GW Status: PR - 6/21/2014
Well Name/No:WPX ENERGY #PA 524-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date6/21/2014
FacilityID:433911LocationID:323841
County:GARFIELD #045Location:NESW 2 7S95W 6
Field:PARACHUTE - #67350Elevation:5820 ft.
Basin:PICEANCE BASIN  
Planned Location:2001FSL  1575 FWLLat/Long: 39.464977 / -107.969226Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.464976 / -107.969227Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/13/2014
End Date: 5/16/2014
Reported: 7/1/2014
Days to report: 46
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 6/21/2014             Measured TD: 7850 ft.    Vertical TD: 7472 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 6/21/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/14/2015
Proposed Top PZ Location:Sec:2 Twp: 7S 95W Footage: 184 FSL  2105 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95W Footage: 184 FSL  2105 FWL
Proposed Depth/Form:7840 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-46 , Unit Acreage: 320, Drill Unit: Sec 2:W/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 884 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 237, Top: 0 ft., Bottom: 884 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7840 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 867, Top: 4179 ft., Bottom: 7840 ft.

Wellbore Completed
Completion Date:4/15/2014
Spud Date:4/10/2014Spud Date Is:ACTUAL
Measured TD:7850 ft.Measured PB depth:7774 ft.
True Vertical TD:7472 ft.True Vertical PB depth:7396 ft.
Top PZ Location:Sec:2 Twp: 7S 95WFootage: 233 FSL  2123 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95WFootage: 209 FSL  2082 FWL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 909 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 250, Top: 0 ft., Bottom: 909 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7830 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1475, Top: 2876 ft., Bottom: 7830 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1977 ft.
MESAVERDE4339 ft.
CAMEO6729 ft.
ROLLINS7678 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 6/21/2014                 Interval Top: 5643 ft.    Interval Bottom: 7585 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/15/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/13/2014Treatment End Date:5/16/2014
Treatment Summary:989000# 40/70 Sand; 27024 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):27024Max pressure during treatment (psi):5628
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.69
Recycled water used in treatment (bbls):27024Total flowback volume recovered (bbls):16972
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):989000Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7399 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/21/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1046
CALC_MCF_GAS 1137
CASING_PRESS 1774
MCF_GAS 1137
TUBING_PRESS 1417
Perforation Data:
Interval Top:5643 ft.# Of Holes:129
Interval Bottom:7585 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)39
Total Gas Produced (MCF)27278
GOR699435
GOR DeterminationMCFE
Average BOE per Day13.001
Average MCFE per Day75.395

 Federal Financial Assurance  i 

 Tribal Well  i No