Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22138
Well Classification: GW Status: PR - 3/1/2015
Well Name/No:WPX ENERGY #PA 513-2
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date3/1/2015
FacilityID:433897LocationID:323841
County:GARFIELD #045Location:NESW 2 7S95W 6
Field:PARACHUTE - #67350Elevation:5820 ft.
Basin:PICEANCE BASIN  
Planned Location:2028FSL  1560 FWLLat/Long: 39.465048 / -107.969265Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465048 / -107.969279Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 5/19/2014
End Date: 5/24/2014
Reported: 7/1/2014
Days to report: 38
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 3/1/2015             Measured TD: 7572 ft.    Vertical TD: 7454 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 3/1/2015
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/14/2015
Proposed Top PZ Location:Sec:2 Twp: 7S 95W Footage: 1509 FSL  644 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95W Footage: 1509 FSL  664 FWL
Proposed Depth/Form:7576 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-46 , Unit Acreage: 320, Drill Unit: Sec 2:W/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 941 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 251, Top: 0 ft., Bottom: 7576 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7576 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 864, Top: 3929 ft., Bottom: 7576 ft.

Wellbore Completed
Completion Date:3/22/2014
Spud Date:3/16/2014Spud Date Is:ACTUAL
Measured TD:7572 ft.Measured PB depth:7525 ft.
True Vertical TD:7454 ft.True Vertical PB depth:7407 ft.
Top PZ Location:Sec:2 Twp: 7S 95WFootage: 1521 FSL  689 FWL
Bottom Hole Location:Sec:2 Twp: 7S 95WFootage: 1493 FSL  627 FWL
Log Types:SP/GR/HDIL/ZDL/CN/MUD and CBL
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 42 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 16, Top: 0 ft., Bottom: 42 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 946 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 275, Top: 0 ft., Bottom: 946 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 7556 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1420, Top: 3450 ft., Bottom: 7556 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G1987 ft.
MESAVERDE4083 ft.
CAMEO6482 ft.
ROLLINS7414 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 3/1/2015                  Interval Top: 5318 ft.    Interval Bottom: 7341 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:5/24/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:Yes
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:5/19/2014Treatment End Date:5/24/2014
Treatment Summary:1045800# 40/70 Sand; 28791 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):28791Max pressure during treatment (psi):6175
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.73
Recycled water used in treatment (bbls):28791Total flowback volume recovered (bbls):9482
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1045800Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7141 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:6/15/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1031
CALC_MCF_GAS 1770
CASING_PRESS 1363
MCF_GAS 1770
TUBING_PRESS 887
Perforation Data:
Interval Top:5318 ft.# Of Holes:144
Interval Bottom:7341 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)30
Total Gas Produced (MCF)22759
GOR758633
GOR DeterminationMCFE
Average BOE per Day10.835
Average MCFE per Day62.855

 Federal Financial Assurance  i 

 Tribal Well  i No