Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITClick image to access interactive map at well/facility location. GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22133
Well Classification: GW Status: PR - 8/16/2014
Well Name/No:WPX ENERGY PA #43-3
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date8/16/2014
FacilityID:433892LocationID:323841
County:GARFIELD #045Location:NESW 2 7S95W 6
Field:PARACHUTE - #67350Elevation:5820 ft.
Basin:PICEANCE BASIN  
Planned Location:2069FSL  1525 FWLLat/Long: 39.465160 / -107.969401Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.465160 / -107.969401Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 7/7/2014
End Date: 7/12/2014
Reported: 8/26/2014
Days to report: 45
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: AB - 9/2/2014             Measured TD: 3585 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        AB - 9/2/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:8/14/2015
Proposed Top PZ Location:Sec:3 Twp: 7S 95W Footage: 2515 FSL  1058 FEL
Bottom Hole Location:Sec:3 Twp: 7S 95W Footage: 2515 FSL  1058 FEL
Proposed Depth/Form:8232 ft.
Surface Mineral Owner Same:Yes
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-46 , Unit Acreage: 320, Drill Unit: Sec 3: S/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 60 ft., Weight: 48 , Citings Type: PLANNED
Cement:Sacks: 50, Top: 0 ft., Bottom: 60 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1201 ft., Weight: 32.3 , Citings Type: PLANNED
Cement:Sacks: 316, Top: 0 ft., Bottom: 1201 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8232 ft., Weight: 11.6 , Citings Type: PLANNED
Cement:Sacks: 861, Top: 4604 ft., Bottom: 8232 ft.

Wellbore Completed
Completion Date:5/16/2014
Spud Date:5/12/2014Spud Date Is:ACTUAL
Measured TD:3585 ft.Measured PB depth:1810 ft.
True Vertical TD:True Vertical PB depth:
Bottom Hole Location:Sec:3 Twp: 7S 95WFootage: 2382 FSL  365 FEL
Log Types:
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 69 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 26, Top: 0 ft., Bottom: 69 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1230 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1230 ft., Determination Method: VISU
  No formation data to display.

Sidetrack #01             Wellbore Classification: GW             Status: PR - 8/16/2014             Measured TD: 8195 ft.    Vertical TD: 7452 ft.

 Wellbore Data for Sidetrack #01Wellbore Classification: GW        PR - 8/16/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/24/2016
Proposed Top PZ Location:Sec:3 Twp: 7S 95W Footage: 2515 FSL  1058 FEL
Bottom Hole Location:Sec:3 Twp: 7S 95W Footage: 2515 FSL  1058 FEL
Proposed Depth/Form:8183 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 440-46 , Unit Acreage: 320, Drill Unit: S/2
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 69 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 26, Top: 0 ft., Bottom: 69 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1230 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 325, Top: 0 ft., Bottom: 1230 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8183 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 866, Top: 4529 ft., Bottom: 8183 ft.

Wellbore Completed
Completion Date:5/22/2014
Spud Date:5/12/2014Spud Date Is:ACTUAL
Measured TD:8195 ft.Measured PB depth:8140 ft.
True Vertical TD:7452 ft.True Vertical PB depth:7397 ft.
Top PZ Location:Sec:3 Twp: 7S 95WFootage: 2498 FSL  1032 FEL
Bottom Hole Location:Sec:3 Twp: 7S 95WFootage: 2454 FSL  1081 FEL
Log Types:CBL, Mud, and Reservoir Performance Monitor (RPM)
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 69 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 26, Top: 0 ft., Bottom: 69 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1230 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 325, Top: 0 ft., Bottom: 1230 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8181 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1500, Top: 3230 ft., Bottom: 8181 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2336 ft.
MESAVERDE4706 ft.
CAMEO7108 ft.
ROLLINS8024 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 8/16/2014                 Interval Top: 5952 ft.    Interval Bottom: 7983 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:7/9/2014Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:No
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:7/7/2014Treatment End Date:7/12/2014
Treatment Summary:1206901# 40/70 Sand; 32339 Bbls Slickwater; (Summary) *All flowback water entries are total estimates based on commingled volumes.
Total fluid used in treatment (bbls):32339Max pressure during treatment (psi):5402
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:7
Total acid used in treatment (bbls):Min frac gradient (psi/ft):0.71
Recycled water used in treatment (bbls):32339Total flowback volume recovered (bbls):9199
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):1206901Green completions techniques utilized:Yes
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7770 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:8/16/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1104
CALC_MCF_GAS 962
CASING_PRESS 1800
MCF_GAS 962
TUBING_PRESS 1451
Perforation Data:
Interval Top:5952 ft.# Of Holes:152
Interval Bottom:7983 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
November 2024 - October 2025i
Total Oil Produced (Barrels)51
Total Gas Produced (MCF)33561
GOR658058
GOR DeterminationMCFE
Average BOE per Day15.999
Average MCFE per Day92.783

 Federal Financial Assurance  i 

 Tribal Well  i No