|
|
| |
|
|
|
|
Wellbore #00 Wellbore Classification: GW Status: PR - 8/4/2014 Measured TD: 5635 ft. Vertical TD: 5335 ft.| Wellbore Data for Original Wellbore | Wellbore Classification: GW PR - 8/4/2014 | | Wellbore Permit | DIRECTIONAL | | Permit #: | | Expiration Date: | 7/30/2015 | | Proposed Top PZ Location: | Sec:22 Twp: 7S 96W | Footage: 515 FSL 209 FWL | | Bottom Hole Location: | Sec:22 Twp: 7S 96W | Footage: 515 FSL 209 FWL | | Proposed Depth/Form: | 5706 ft. | | Surface Mineral Owner Same: | No | | Mineral Owner: | FEDERAL | Surface Owner: | FEE | | Unit: | | Unit Number: | | | Formation And Spacing: | Code: WMFK , Formation: WILLIAMS FORK , Order: 510-14 , Unit Acreage: , Drill Unit: | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48# , Citings Type: PLANNED | | Cement: | Sacks: 60, Top: 0 ft., Bottom: 80 ft. | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1059 ft., Weight: 32.3# , Citings Type: PLANNED | | Cement: | Sacks: 280, Top: 0 ft., Bottom: 1059 ft. | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 5583 ft., Weight: 11.6# , Citings Type: PLANNED | | Cement: | Sacks: 731, Top: , Bottom: 5583 ft. |
| | |
| Wellbore Completed | | Completion Date: | 3/27/2014 | | Spud Date: | 3/22/2014 | Spud Date Is: | ACTUAL | | Measured TD: | 5635 ft. | Measured PB depth: | 5592 ft. | | True Vertical TD: | 5335 ft. | True Vertical PB depth: | 5292 ft. | | Top PZ Location: | Sec:22 Twp: 7S 96W | Footage: 514 FSL 227 FWL | | Bottom Hole Location: | Sec:22 Twp: 7S 96W | Footage: 491 FSL 220 FWL | | Log Types: | SP GR HDIL ZDL RPM CN CBL MUDLOGS
**NOTE: LOGS ARE ATTACHED TO THIS WELL COMPLETION REPORT. | | Casing: | String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 40 ft., Weight: 48 , Citings Type: ACTUAL | | Cement: | Sacks: 15, Top: 0 ft., Bottom: 40 ft., Determination Method: VISU | | Casing: | String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1107 ft., Weight: 32.3 , Citings Type: ACTUAL | | Cement: | Sacks: 295, Top: 0 ft., Bottom: 1107 ft., Determination Method: VISU | | Casing: | String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 5623 ft., Weight: 11.6 , Citings Type: ACTUAL | | Cement: | Sacks: 1120, Top: 1184 ft., Bottom: 5623 ft., Determination Method: CBL | | Formation | Interval Top | Log Bottom | Cored | DSTs | | WASATCH G | 874 ft. | | | | | MESAVERDE | 2662 ft. | | | | | CAMEO | 5038 ft. | | | | | ROLLINS | 5516 ft. | | | |
Formation WFCM Formation Classification: OW Status: PR - 8/4/2014 Interval Top: 4227 ft. Interval Bottom: 5471 ft.| Completed Information for Formation WILLIAMS FORK - CAMEO | | 1st Production Date: | 4/24/2014 | Choke Size: | | | Formation Name: | WILLIAMS FORK - CAMEO | Commingled: | No | | Production Method: | | | Open Hole Completion: | No |
| | Formation Treatment | | Treatment Type: | FRACTURE STIMULATION | | Treatment Date: | 4/22/2014 | Treatment End Date: | 4/23/2014 | | Treatment Summary: | 4 STAGES: 436700 # 40/70 Sand: 11861 Bbls Slickwater (Summary) | | Total fluid used in treatment (bbls): | 11861 | Max pressure during treatment (psi): | 3428 | | Total gas used in treatment (mcf): | | Fluid density (lbs/gal): | 8.43 | | Type Of gas: | | Number Of staged intervals: | 4 | | Total acid used in treatment (bbls): | | Min frac gradient (psi/ft): | 0.62 | | Recycled water used in treatment (bbls): | 11861 | Total flowback volume recovered (bbls): | 4272 | | Fresh water used in treatment (bbls): | | Disposition method For flowback: | RECYCLE | | Total proppant used (lbs): | 436700 | Green completions techniques utilized: | Yes | | Reason green techniques Not utilized: |
| | Tubing Size: | 2.375 in. | Tubing Setting Depth: | 5329 ft. | | Tubing Packer Depth: | | Tubing Multiple Packer: | | | Open Hole Top: | | Open Hole Bottom: | | | Initial Test Data: | | Test Date: | N/A | Test Method: | FLOWING | | Hours Tested: | 24 | Gas Type: | DRY | | Gas Disposal: | SOLD | |
| Test Type | Measure |
|---|
| BTU_GAS | 1082 | | CALC_MCF_GAS | 593 | | CASING_PRESS | 1369 | | MCF_GAS | 593 | | TUBING_PRESS | 1254 |
| | Perforation Data: | | Interval Top: | 4227 ft. | # Of Holes: | 87 | | Interval Bottom: | 5471 ft. | Hole Size: | 0.35 in. |
|
|
|
|
|
|
|
| Reported Plugged | N | |
| Out Of Service Repurposed | N | |
| Out Of Service | N | |
| Inactive Exception | N | |
| Noticed Inactive | N | |
| Defined Inactive | N | |
| Low Producing | N | |
| Total Oil Produced (Barrels) | 45 |
| Total Gas Produced (MCF) | 34876 |
| GOR | 775022 |
| GOR Determination | MCFE |
| Average BOE per Day | 16.590 |
| Average MCFE per Day | 96.201 |
| Federal Financial Assurance | i | |
|
|