Skip to Main Content

COGIS

Facility Detail

COGIS - WELL SCOUT CARD

Click image to view related facilities. Related  Click image to view inspection information. InspClick image to view MIT information. MITGIS Map GISOld GIS Map Old GISClick image to view imaged documents for this well/facility. DocClick image to view imaged documents for this well/facility. COAClick image to view wellbore completion diagram. WellboreClick image to search for orders within this facility's section. OrdersClick image to view bradenhead scoutcard data. Bradenhead
 Surface Location
 API# 05-045-22090
Well Classification: GW Status: PR - 2/14/2014
Well Name/No:WPX Energy #RWF 331-4
(Click Well Name for Production Data)
Click Here for Transporter Gatherer Info
Operator:TEP ROCKY MOUNTAIN LLC - 96850
(Click Operator Name for Company Detail Report)
Federal Or State Lease #:
Facility Status:PRStatus Date2/14/2014
FacilityID:433495LocationID:323991
County:GARFIELD #045Location:LOT 2 4 7S94W 6
Field:RULISON - #75400Elevation:5794 ft.
Basin:PICEANCE BASIN  
Planned Location:430FNL  1690 FELLat/Long: 39.473292 / -107.888982Lat/Long Source: Field Measured
As Drilled Location:Footages Not AvailableLat/Long: 39.473292 / -107.888982Lat/Long Source: Field Measured
 
FracFocus
Disclosure: Sidetrack #00
Start Date: 12/13/2013
End Date: 12/17/2013
Reported: 1/30/2014
Days to report: 44
 Wellbore And Formation Details -- select either a wellbore Or formation to expand.
 

Wellbore #00             Wellbore Classification: GW             Status: PR - 2/14/2014             Measured TD: 8162 ft.    Vertical TD: 8015 ft.

 Wellbore Data for Original WellboreWellbore Classification: GW        PR - 2/14/2014
Wellbore PermitDIRECTIONAL
Permit #: Expiration Date:7/2/2015
Proposed Top PZ Location:Sec:4 Twp: 7S 94W Footage: 977 FNL  2515 FWL
Bottom Hole Location:Sec:4 Twp: 7S 94W Footage: 977 FNL  2515 FWL
Proposed Depth/Form:8192 ft.
Surface Mineral Owner Same:No
Mineral Owner:FEESurface Owner:FEE
Unit: Unit Number:
Formation And Spacing:Code: WMFK , Formation: WILLIAMS FORK , Order: 139-64 , Unit Acreage: 640, Drill Unit: Sec. 4: All
Casing:String Type: CONDUCTOR, Hole Size: 26 in., Size: 18 in., Top: 0 ft., Depth: 80 ft., Weight: 48# , Citings Type: PLANNED
Cement:Sacks: 60, Top: 0 ft., Bottom: 80 ft.
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1118 ft., Weight: 32.3# , Citings Type: PLANNED
Cement:Sacks: 295, Top: 0 ft., Bottom: 1118 ft.
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8192 ft., Weight: 11.6# , Citings Type: PLANNED
Cement:Sacks: 943, Top: , Bottom: 8192 ft.

Wellbore Completed
Completion Date:11/11/2013
Spud Date:11/2/2013Spud Date Is:ACTUAL
Measured TD:8162 ft.Measured PB depth:8116 ft.
True Vertical TD:8015 ft.True Vertical PB depth:7969 ft.
Top PZ Location:Sec:4 Twp: 7S 94WFootage: 979 FNL  2486 FWL
Bottom Hole Location:Sec:4 Twp: 7S 94WFootage: 985 FNL  2459 FWL
Log Types:RPM/CBL/MUD
Casing:String Type: CONDUCTOR, Hole Size: 24 in., Size: 18 in., Top: 0 ft., Depth: 63 ft., Weight: 48 , Citings Type: ACTUAL
Cement:Sacks: 24, Top: 0 ft., Bottom: 63 ft., Determination Method: VISU
Casing:String Type: SURF, Hole Size: 13.5 in., Size: 9.625 in., Top: 0 ft., Depth: 1128 ft., Weight: 32.3 , Citings Type: ACTUAL
Cement:Sacks: 315, Top: 0 ft., Bottom: 1128 ft., Determination Method: VISU
Casing:String Type: 1ST, Hole Size: 8.75 in., Size: 4.5 in., Top: 0 ft., Depth: 8150 ft., Weight: 11.6 , Citings Type: ACTUAL
Cement:Sacks: 1395, Top: 3906 ft., Bottom: 8150 ft., Determination Method: CBL
FormationInterval TopLog BottomCoredDSTs
WASATCH G2060 ft.
MESAVERDE4538 ft.
CAMEO7065 ft.
ROLLINS8016 ft.

Formation WFCM                     Formation Classification:  OW                     Status:  PR - 1/20/2014                 Interval Top: 5962 ft.    Interval Bottom: 7756 ft.

 Completed Information for Formation WILLIAMS FORK - CAMEO
1st Production Date:12/13/2013Choke Size: 
Formation Name:WILLIAMS FORK - CAMEOCommingled:
Production Method:
Open Hole Completion:No
Formation Treatment
Treatment Type:FRACTURE STIMULATION
Treatment Date:12/13/2013Treatment End Date:12/17/2013
Treatment Summary:1755 Gals 7 ½% HCL; 636500 # 40/70 Sand: 18510 Bbls Slickwater (Summary)
Total fluid used in treatment (bbls):18552Max pressure during treatment (psi):6330
Total gas used in treatment (mcf):Fluid density (lbs/gal):8.43
Type Of gas:Number Of staged intervals:6
Total acid used in treatment (bbls):41Min frac gradient (psi/ft):0.82
Recycled water used in treatment (bbls):18510Total flowback volume recovered (bbls):8425
Fresh water used in treatment (bbls):Disposition method For flowback:RECYCLE
Total proppant used (lbs):636500Green completions techniques utilized:--
Reason green techniques Not utilized: 
Tubing Size:2.375 in.Tubing Setting Depth:7544 ft.
Tubing Packer Depth:Tubing Multiple Packer:
Open Hole Top:Open Hole Bottom:
Initial Test Data:
Test Date:1/20/2014Test Method:Flowing
Hours Tested:24Gas Type:DRY
Gas Disposal:SOLD
Test TypeMeasure
BTU_GAS 1046
CALC_MCF_GAS 1032
CASING_PRESS 1277
MCF_GAS 1032
TUBING_PRESS 958
Perforation Data:
Interval Top:5962 ft.# Of Holes:122
Interval Bottom:7756 ft.Hole Size:0.35 in.
Primary Well Designation:
None      i
            All DesignationsDate
Reported PluggedN 
Out Of Service RepurposedN 
Out Of ServiceN 
Inactive ExceptionN 
Noticed InactiveN 
Defined InactiveN 
Low ProducingN 

BOE/MCFE/GOR Calculations
Production for Previous 12 Months
February 2025 - January 2026i
Total Oil Produced (Barrels)43
Total Gas Produced (MCF)22413
GOR521232
GOR DeterminationMCFE
Average BOE per Day10.709
Average MCFE per Day62.118

 Federal Financial Assurance  i 

 Tribal Well  i No